• Evaluation model of water pollution control project in region is constructed by using relation between fuzzy consistency matrix and its weights.

    运用模糊一致性矩阵与其权重关系构造了区域水污染控制方案评价模型

    youdao

  • Then the fuzzy multi-objective decision methods and mathematics model of product project based on virtual design simulation for product life-cycle were expounded.

    此基础提出了虚拟环境下生命周期产品设计方案模糊多目标决策方法数学模型

    youdao

  • Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.

    模糊数学层次分析方法相结合建立模糊层次分析模型应用工程项目质量风险分析

    youdao

  • This paper identifies the project characteristics and risk events used in the model; explains the structure of the model and the use of fuzzy logic.

    讨论模型来识别项目特征风险事件解释了模型结构模糊逻辑分析法应用

    youdao

  • With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.

    项目寿命周期影响现金流建设阶段运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型

    youdao

  • In light of the actual project, this article established fuzzy evaluation model of long-span steel truss construction scheme optimization.

    结合实际工程建立跨度桁架施工方案优选模糊评判模型

    youdao

  • Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.

    接着对比分析各类风险评价方法基础上,构建了基于模糊综合评价的风险决策模型

    youdao

  • Application of fuzzy comprehensive evaluation, the Huaneng Power Plant in Qufu flue gas desulphurization project evaluation model is made.

    应用综合评价法中的模糊综合评价法建立华能曲阜电厂烟气脱硫项目后评价模型。

    youdao

  • The aim of the project is to divide the commanders operational command capability index system, and to realize evaluating it by using two-level fuzzy synthesis evaluation model.

    指挥员作战指挥能力建立多层评估指标体系采用二级模糊综合评判模型对其评估。

    youdao

  • After established the evaluation index system, this article established the project orientation decision-making model which based on fuzzy comprehensive evaluation.

    指标体系确定基于模糊综合评判建立了商业地产项目定位决策模型

    youdao

  • This paper improves the model based on the fuzzy optimum theory, which uses the difference matrix method to compare the reference project and other projects.

    采用矩阵方法各个方案隶属度同基准方案隶属度进行比较,从而得到各个方案相对基准方案的相对进步度。

    youdao

  • The strategy model of international competitive bidding is built on the basis of fuzzy set theory, and it is a very applicable for international project contractors.

    国际竞争性投标策略模型基于模糊集合技术建立起来,是一种非常适用承包商实际应用的模型。

    youdao

  • The strategy model of international competitive bidding is built on the basis of fuzzy set theory, and it is a very applicable for international project contractors.

    国际竞争性投标策略模型基于模糊集合技术建立起来,是一种非常适用承包商实际应用的模型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定