• The full-scale fatigue test of connection structure details between floor beams and monolithic joints was carried out on the Caiyuanba Yangtze River bridge in Chongqing.

    重庆菜园坝长江大桥轨道横梁整体节点连结构造细节进行足尺模型疲劳试验

    youdao

  • The full-scale full-ring lining structure test has been carried out in China, but the full-scale segment joint experiment of super tunnel lining was conducted first time.

    国内超大隧道衬砌管片试验进行过整环试验,文中介绍超大隧道衬砌管片接头试验国内尚属首次

    youdao

  • The rigidity calculation of the closed thin - walled section rod structure of aircraft is carried out by using finite element method and the result tallies with the full - scale test value well.

    利用有限元飞机闭合薄壁剖面结构进行刚度计算结果尺寸试验吻合较

    youdao

  • The rigidity calculation of the closed thin - walled section rod structure of aircraft is carried out by using finite element method and the result tallies with the full - scale test value well.

    利用有限元飞机闭合薄壁剖面结构进行刚度计算结果尺寸试验吻合较

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定