• A framework is arranged between the upper panel and the lower panel the front sides are connected with the tail sealing board of the ship, wherein, the lower panel is flushed with the ship floor.

    面板骨架,它们前边船体连接其中面板与船体底板平齐

    youdao

  • A framework is arranged between the upper panel and the lower panel the front sides are connected with the tail sealing board of the ship, wherein, the lower panel is flushed with the ship floor.

    面板骨架,它们前边船体连接其中面板与船体底板平齐

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定