• Flow shop scheduling problems.

    流水作业排序问题

    youdao

  • No-idle flow shop(NIFS) problem with makespan criterion is studied.

    研究了最大完工时间为目标的零空闲流水线调度问题

    youdao

  • Then, found its application in flow shop scheduling problems with two objects.

    应用算法解决了双目标的流水车间调度问题

    youdao

  • Where it is usually found: In a cellular shop, batch flow shop, batch job shop.

    通常发生:密集性车间批量流程车间生产,批量工作车间生产。

    youdao

  • The Flow shop scheduling problem under simple linear deterioration was considered.

    讨论工件具有线性恶化加工时间的调度问题

    youdao

  • An ant colony optimization based algorithm for permutation flow shop scheduling was proposed.

    提出一种求解置换流水车间调度优化算法

    youdao

  • Give the arithmetic examples of flow shop and job shop, and show their schedule Gantt pictures.

    针对流水调度作业调度给出算法实例并且绘制出了流水和作业调度的

    youdao

  • The problem of the combination of machines for flow shop quality inspection is studied in this paper.

    研究了一类流水作业质量检验机床组合问题

    youdao

  • The problem of the combination of inspection facilities for flow shop quality inspection is studied in this paper.

    研究了一类流水作业质量检验检验设备组合问题

    youdao

  • In the establishment of hybrid flow shop (HFS), how many parallel machines being set at every stage will be reasonable is a problem to be studied.

    混合流水车间构建过程中,每个阶段配置几台平行最为合理一个有待确定问题

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

  • For the difficulties of flexible flow shop(FFS)dynamic scheduling problem, the problem's character is analyzed, and the model of the problem is built.

    针对柔性流水车间动态调度求解困难问题首先分析调度问题特征构建问题模型

    youdao

  • No-wait flow shop scheduling problems with total flow time minimization is an important manufacturing system widely existing in industrial environments.

    完工时间目标的无等待流水车间调度问题一个重要制造加工系统广泛应用于工业生产中。

    youdao

  • The problem of acyclic reconfigurable flow shop modeling and optimization is studied for the new manufacturing paradigm-reconfigurable manufacturing system.

    针对可重构制造新的制造模式,研究一类非周期可重构流水作业的建模优化问题

    youdao

  • Multistage processing priority was developed for the hybrid flow shop problem and an iterated local search algorithm was used for solving this kind of problem.

    针对混合流水车间调度问题,提出分阶段加工优先级的调度原则,迭代局部搜索算法应用求解问题。

    youdao

  • According to ants' routing behavior model and its resemblance to hybrid flow shop scheduling, an ant-like scheduling algorithm for hybrid flow shop is put forward.

    根据蚂蚁路径寻优行为模型及其车间调度的相似性,提出混流车间蚂蚁调度算法

    youdao

  • According to ants "routing behavior model and its resemblance to hybrid flow shop scheduling, an ant-like scheduling algorithm for hybrid flow shop is put forward."

    根据蚂蚁路径寻优行为模型及其车间调度的相似性,提出混流车间蚂蚁调度算法

    youdao

  • Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.

    大多数一般的多于台机床流水车间作业排序问题属于NPC问题实际生产中一般采用启发式算法

    youdao

  • This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.

    采用网络理论构造平行流水作业连接图模型,提出了采用群算法求解平行流水作业计划问题,以及求解过程可行路径表的建立方法

    youdao

  • If there was no good texture of the old furniture can use, might as well go see antique furniture store, or junk flow shop, maybe he fled to another family of family heirloom.

    如果家里没有很好质地家具可供运用不妨看看古董家具旧货流转商店里说不定到了另一户人家的传家宝。

    youdao

  • A new evolutionary algorithm for solving multi-objective hybrid flow shop scheduling problem(HFSP) which is an important topic in supply chain network optimization is presented.

    针对供应链网络优化领域中的混合流水作业调度问题提出一种新的目标演化优化算法

    youdao

  • No-wait flow shop problem is one of flow shop problems, and is a typically NP-complete problem, which means that it is impossible to find the global optimum in polynomial complexity.

    等待问题流水车间调度中的种,是一类典型NP完全问题,已证明多项式时间内得不到值。

    youdao

  • The shop has a cash flow of $30,000 a month.

    这家商店的流动现金为每月三万美元。

    youdao

  • The mesh does not restrict air flow or produce tunneling effects that might have unintended consequences with respect to paint shop ventilation systems.

    塑料阻挡气流,也不会改变气流走向,不影响车间预先设计的排风。

    youdao

  • The ball flow meters can be built with common shop tools.

    球式流量计可以普通的工厂设备制出。

    youdao

  • This paper analyzes the conflict of flow - shop and proposes a method of expressing the conflict by using a time - period matrix.

    文章流水冲突问题进行分析给出时段间隔矩阵表示流水线冲突状态方法

    youdao

  • They create hybrid facilities consisting of flow-line-like components where they build the common platforms and job shop-like components where they customize the products.

    他们建设通用个性化平台组成混合型设施,前者以流水线方式生产通用零部件后者则用专业化车间的方式生产体现产品个性化的零部件。

    youdao

  • They create hybrid facilities consisting of flow-line-like components where they build the common platforms and job shop-like components where they customize the products.

    他们建设通用个性化平台组成混合型设施,前者以流水线方式生产通用零部件后者则用专业化车间的方式生产体现产品个性化的零部件。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定