Check for faulty fill valve operation.
检查有问题的进水阀门状态。
If none of the above does the trick, you may have a misadjusted or faulty fill valve that needs replacement.
如果以上办法还不能解决问题,那么可能是入水阀门不合适或者太劣质,需要重新换一个。
The adapter may also be coupled to a fill valve without a horizontal outlet where an exit port is defined in the vertical conduit of the fill valve.
所述管接头还可耦合到不具有水平出水口的其中在所述进水阀的垂直导管中界定有排出孔口的进水阀。
The new HP package contains quality Watts components … including the new AS-B Bronze Air Scoop and the B911S Combination Bronze Fill Valve and Backflow Preventer.
最新的HP组件包内含优质的美国瓦茨部件,包括:新型AS-B青铜导气罩和B911S青铜进水阀和防倒流装置组合件。
The adapter is non-removably coupled to the fill valve and is configured with a larger proximal pathway, and a smaller distal metering pathway for restricting the refill flow rate.
所述管接 头以不可移除的方式耦合到所述进水阀,且配置有较大的近端通路和用于限制补水流速的较小的远端计量通路。
If the tank is not filling all the way (there should be a fill line on the inside of the tank), carefully bend the bulb of the float valve up a bit and see if the tank will fill.
如果水箱没有充满正常水量(水箱内侧应该有一条水位线),慢慢地弯曲一下浮囊阀,看水位会不会上升。
Open the "hot out" valve and let the tank start to fill. It will take probably about 5-10 minutes or so to get 45 gallons into the tank.
当我们打开热水出水阀,水会自然地流入水箱,只要5至10分钟左右,水箱内就能添加45加仑水。
Take an empty two-liter soda bottle, wash it out, fill it with water, screw the lid on tightly and set it into your toilet tank, as far away from the flapper valve as possible.
拿一个两升的空汽水瓶,洗干净,装满水,旋紧盖子,放进马桶的水箱里,离舌形阀越远越好。
When valve is filled, open the downstream shutoff slowly and fill the water supply system.
阀门注满后,慢慢开启下游关闭阀对水供应系统注水。
Slightly open shutoff valve No. 1 and allow water to fill the tube to the top then close No. 1 shutoff.
稍微开启关闭阀1号,将水注入管子直到顶部为止,然后关闭1号关闭阀。
Open the upstream slowly and fill the valve.
慢慢开启上游并向阀门注水。
To fill the system, open the shutoff valve upstream of the regulator.
如果要给系统进水,请打开调节阀上游的关断阀。
It is also critical for automated fill and drain operations using the optional valve bank and valve controller.
同时自动灌注液和排出液的临界点使用阀门组和阀门控制器进行调节。
First close manual shutoff located before the fill-valve, then draw system pressure down to 12psi (or other preset pressure) and observe system for pressure buildup several hours later.
首先关闭位于进水阀之前的手动关闭阀,然后将系统压力降到12psi(或其他预设压力),几个小时后,观察系统的压力上升状态。
Opening the intake valve before TDC and closing it after BDC increase the fill of air-fuel mixture in the cylinder.
在上止点前打开进气门并在下止点增大气缸内的油气混合物之后关闭。
A fixed height tension rib is arranged in the buffering damping cavity, and the edge is provided with a fluid fill-discharge valve.
它是在缓冲减震腔内设置了定高拉筋,边沿设置了流体充排阀。
Bagging machines - we manufacture Dynamat machines which fill and weigh powder or granular products into valve bags or open top bags of weight capacities from 20 to 50 KGS per bag.
装袋机-我司生产的Dynamat型机器可为每袋20至50千克重的粉状或颗粒产品使用阀口袋或敞口袋进行装袋与称重工作。
By using encrypting Angle valve of steel cylinder, clients must fill gas at designated LPG filling station.
使用该钢瓶加密瓶阀后,只能在我们指定的液化气充装站才能充装。
By using encrypting Angle valve of steel cylinder, clients must fill gas at designated LPG filling station.
使用该钢瓶加密瓶阀后,只能在我们指定的液化气充装站才能充装。
应用推荐