你何时参加第一英语证书考试?
FCE is the name of fuel cell stacks and the auxiliary system.
燃料电池发动机是燃料电池堆及其配套辅助系统的总称。
In Poland, FCE is recognised for recruitment and promotion purposes in the Civil Service.
波兰将FCE考试用于国家公务员聘用及升职的考试中。
Part iv. The paper raises a fuzzy comprehensive evaluation on performance evaluation of listed companies (FCE).
第四部分提出了上市公司经营业绩评价的模糊综合评价法。
On the whole, standard score of FCE assessment of Amikacin production process was 0.828, indicating good safety.
总体来看,阿米卡星生产过程的模糊评价标准分值为0.828,表明其安全等级“较高”。
The third part evaluates the network academic information resources with the method of fuzzy comprehensive evaluation (FCE).
第三部分乃网络学术信息资源模糊综合评价研究。
The results show that the optimum excitation wavelength and the FCE may be very different for the same PAH but in different solvate.
结果表明,样品溶液的荧光转换效率与激发光波长有十分密切的关系,而这种关系又强烈依赖于所用溶剂。
In Part 2, fuzzy comprehensive evaluation (FCE) is introduced including the way of evaluation and the definitions of membership function and weight.
第二部分简要介绍了模糊综合评判法,主要包括评判思路、隶属函数以及权重的确定方法。
The evaluation methods of satellite overall design schemes mainly include analysis hierarchy process (AHP), fuzzy comprehensive evaluation (FCE) and so on.
卫星总体设计方案评价的方法主要有层次分析法(ahp)、模糊综合评判法(FCE)等。
We've all been there at some point of our lives, whether it be for the 11+, the G. C. S. E French oral exam, university finals, the FCE exam… the list is endless.
我们都在一生中的某些时刻参加过考试:初中入学考试、中考的法语口语考试、大学的期末考试、第一英语证书考试……名目之多不可胜数。
A node shall be in the bus-off state when it is switched off from the bus due to a request of FCE. In the bus-off state, a node shall neither send nor receive any frames.
由于错误界定规则,一个节点可能处于离线状态,当处于此状态时,这个节点既不发送也不接收。
Then value the performances of the Wal-Mart with the method of AHP-FCE, and analyzed the results, so that it can provide basis for our enterprises to build the business ecosystem.
运用AHP-FCE评判方法进行评价,以沃尔玛公司为例进行实证,并对结果进行分析,为我国企业构建商业生态系统并进行绩效评价提供依据。
Specific growth rate (SGR), food conversion efficiency (FCE) was significantly higher for fish meal group, and then the soybean meal group, the potato protein group was the lowest.
试验结果表明,银鲫对三种蛋白源的饲料的摄食率,食物转化效率均有显著差异,以鱼粉组最高,豆粕其次,土豆蛋白最低。
To prevent the result of the vendor evaluation just by AHP from individual subjective judgment and favoritism, a new approach to vendor evaluation is proposed combining AHP with FCE.
为了避免层次分析法中人的主观判断、偏好等对供应商评价结果的影响,提出了层次分析法与模糊综合评价相结合的供应商评价方法。
This reserved modeling method and Fuzzy comprehensive Evaluation (FCE) are introduced into comprehensive assessment of power plant, the entire state of the ten units of 600mw were assessed.
本文将反向建模思想与模糊综合评判理论引入电厂评估,对来自十座电厂的十台容量为600 MW机组的总体状态进行综合评判。
Model study primarily covers Analytic Hierarchy Process (AHP), External Factor Analysis Summary (EFAS), Internal Factor Analysis Summary (IFAS), Fuzzy Comprehensive Evaluation (FCE), and so forth.
模型研究主要有层次分析法(AHP)、内外部要素的协同(EFAS)、内部要素的协同(IFAS)、模糊综合评价法(FCE)等方法模型。
Model study primarily covers Analytic Hierarchy Process (AHP), External Factor Analysis Summary (EFAS), Internal Factor Analysis Summary (IFAS), Fuzzy Comprehensive Evaluation (FCE), and so forth.
模型研究主要有层次分析法(AHP)、内外部要素的协同(EFAS)、内部要素的协同(IFAS)、模糊综合评价法(FCE)等方法模型。
应用推荐