To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.
开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。
The report form is formally stipulated to use in the environmental impact assessment for small hydraulic engineering, but its Outlines are unfit for small hydropower stations in the mountainous area.
小水电站工程环境影响评价按有关规范规定为报告表,但其大纲内容不适合山区小水电站环评。
The report form is formally stipulated to use in the environmental impact assessment for small hydraulic engineering, but its Outlines are unfit for small hydropower stations in the mountainous area.
小水电站工程环境影响评价按有关规范规定为报告表,但其大纲内容不适合山区小水电站环评。
应用推荐