• Excavation cleaned up, and then please supervision engineer overhaul, content and design specification requirements may enter the procedure.

    开挖清理完毕后,然后监理工程师检修知足设计规范要求方可进入下一道工序。

    youdao

  • Contact OmegaFlex with your specification and we will engineer a specialty Jacketed Hose assembly for you.

    带上要求我们联络,我们的工程师将会设计一个专业夹套软管给你。

    youdao

  • Upon issue of the Defects Liability Certificate, the Contractor shall return to the Engineer all Drawings, Specification and other documents provided under the Contract.

    发出缺陷责任证书时承包商应将根据合同提供全部图纸规范其它文件退还工程师

    youdao

  • Upon issue of the Defects Liability Certificate, the Contractor shall return to the Engineer all Drawings, Specification and other documents provided under the Contract.

    发出缺陷责任证书时承包商应将根据合同提供全部图纸规范其它文件退还工程师

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定