• An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East sea Bridge Project.

    采取何种高效优质安全施工方法完成跨海段非通航孔桥墩承台施工东海大桥工程建设能否取得成功关键之一

    youdao

  • The high strain dynamic load tests, vertical static load tests and horizontal load tests for part of PHC trial piles of East China Sea Bridge are described.

    介绍东海大桥部分PHC试桩应变动竖向水平荷载试验情况。

    youdao

  • The high strain dynamic load tests, vertical static load tests and horizontal load tests for part of PHC trial piles of East China Sea Bridge are described.

    介绍东海大桥部分PHC试桩应变动竖向水平荷载试验情况。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定