• There are many algorithms of earthwork calculation.

    土方量计算多种算法

    youdao

  • Earthwork calculation is often encountered in building the water projects.

    土方计算工程经常碰到问题。

    youdao

  • In construction of hydroelectric project, small range DTM data are often needed for topographic surveying, mapping, excavated form detection, earthwork calculation and so on.

    水利水电工程施工过程常常需要获得一些小范围DTM数据用于地形测绘开挖形态监测及工程土石方量计算等。

    youdao

  • In this paper, using method of the least squares, optimized calculation of earthwork for leveling up construction site is discussed.

    应用最小乘法研究建筑场地平整土方量优化计算,并以实例说明该法实用可行的。

    youdao

  • To improve the accuracy of cut & fill earthwork volume calculation, triangulate irregular network(TIN)was adopted to build the design model and real model.

    为了提高挖方计算精度采用构建不规则三角法,构建设计模型现实模型。

    youdao

  • To improve the accuracy of cut & fill earthwork volume calculation, triangulate irregular network(TIN)was adopted to build the design model and real model.

    为了提高挖方计算精度采用构建不规则三角法,构建设计模型现实模型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定