Should stand in the side entrance operation. First open water valve to send to the temperature reached e. reascularization gas. Ignite in and out of the oven gas rear can feed.
应站在入口的侧面进行操作。先打开水阀再送电,待炉温达到规定值再通入煤气。点燃进出炉口煤气后方可进料。
Should stand in the side entrance operation. First open water valve to send to the temperature reached e. reascularization gas. Ignite in and out of the oven gas rear can feed.
应站在入口的侧面进行操作。先打开水阀再送电,待炉温达到规定值再通入煤气。点燃进出炉口煤气后方可进料。
应用推荐