• The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.

    评审人员,供应商提出建议要求记录经认可设计报告中,并将详情提交架集团工程总监(PSG)评审验收。

    youdao

  • The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.

    评审人员,供应商提出建议要求记录经认可设计报告中,并将详情提交架集团工程总监(PSG)评审验收。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定