Cracks had appeared in the dam wall after the quake but workers had reinforced it with steel rods.
地震后水坝墙体出现了裂缝,但工人用钢筋加固了。
They are European Ibex. They like to eat the moss and lichen which grows on the wall and they lick the salt off the dam wall too.
牠们是欧洲阿尔卑斯山的野山羊,它们喜欢吃坝墙上的苔藓、地衣和舔坝墙上的盐分。
The Zipingpu reservoir can hold a staggering 1.1 billion cubic meters of water, but the dam wall was cracked after the earthquake.
紫坪铺水库可以容纳11亿立方米的水,但是坝身在地震之后出现了裂缝。
The dam wall is 870 ft. (265 m) high - taller than the Hoover dam - and when completed, the dam formed a reservoir 47 miles (75 km) long that completely submerged the old town of Tehri.
大坝高870英尺(265米)——比胡弗大坝高——竣工以后,该大坝形成了一个长达47英里(75千米)的蓄水池,完全是老的特赫里城镇完全陷入水中。
If the distance between the wall and the dam was large in comparison to the wavelength, then what happens?
如果墙和坝之间的距离比波长大,那么会导致什么?
By mid-2006, construction of the main wall was completed and a reservoir more than 2 miles (3 kilometers) across had filled just upstream of the dam.
到2006年中期,建设主墙已完成,水库超过2英里(3公里),跨越了充满正义上游的大坝。
This paper presents sand and cobble foundation treatment of overflow dam, guide wall and overflow weir by "high pressure jet grouting" at an in Hydropower Station.
本文主要介绍应用“高喷”技术对安居水电站溢流坝、堰坝导墙、溢流堰天窗沙卵石基础处理的方法和体会。
The dam burst and sent a wall of water rushing down the valley.
堤坝崩溃,产生一堵水墙顺着山谷奔流直下。
The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.
黄壁庄水库副坝防渗心墙加固工程所需高性能混凝土,要求和易性好、早期强度低、后期强度高、抗渗性能好、低弹模和高抗拉强度。
The reservoir dam is an earth dam with a clay core wall, built earliest in our country.
水库大坝是我国建设最早的碾压式粘土心墙土石坝。
The test results show that the apron can reduce back flow at the dam toe, and the piers can obviously diminish river bed scouring near the scour resistant wall.
试验结果表明:护坦减轻了下游纵向围堰左侧坝趾处的回流淘刷,隔流墩明显减轻了防冲墙附近河床的冲刷,确保了坝基和下游纵向围堰的安全。
This article bases on practice of building seepage prevention wall in secondary dam of Huangbizhuang reservoir, analyses the causes of the accident, and summarizes precautionary and treatment methods.
根据黄壁庄水库副坝防渗墙的施工实践,分析了这些事故发生的原因,并总结了预防措施以及发生事故后的处理方法,这对今后混凝土防渗墙的施工是个借鉴。
The law of observed water level change in piezometric tube is analyzed in this paper. Furthermore, the stability of soil core wall dam on the unsteady seepage is studied.
分析了刘家峡黄土心墙坝测压管实测水位变化规律,研究了黄土心墙坝在非恒定渗流下的稳定性。
According to the safe slope ratio of earth-filled core wall and the seepage calculation of earth dam, a simple method to calculate the core wall thickness of earth dam is given.
文章从心墙填筑填土料的安全渗透比降为基础,结合土坝的渗流计算,得出土坝心墙厚度的简便计算方法。
Finally, the shear strength reduction technique is used to analyze the seismic stability of Nuo Zhadu core wall type rockfill Dam and Chang Heba core wall type rockfill Dam in FEM.
最后,采用有限元强度折减技术分析了糯扎渡心墙堆石坝及长河坝心墙堆石坝上下游坝坡的抗震稳定性。
The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.
实践表明,浇筑式沥青混凝土适用于寒冷地区土石坝的防渗心墙。
Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.
世界上最大的三项人造工程是中国的长城,埃及的金字塔和阿斯旺高坝,它也在埃及。
The principle of high-density resistivity method was introduced in this paper, and the method was used in the detection of concrete anti-seepage wall of Longtoushi hydropower station dam.
对高密度电法的工作原理进行了介绍,并应用该方法对龙头石水电站大坝混凝土防渗墙进行检测。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
This paper introduces the treatment for deep dam foundation of the concrete cut off wall, which intensity and elastic modulus value are requirement to satisfy the stress, strain and durability.
本文介绍了砼防渗墙对土石坝深厚覆盖层地基的处理,强调防渗墙砼强度及弹模取值应在满足应力应变的前提下,兼顾耐久性等要求。
The changes of pore water pressure in the core wall of earth - rockfill dam are generally delayed relating to that of the reservoir level.
土石坝心墙中孔隙水压力的变化常滞后于库水位的升降。
The reinforced earth structure is popularized in the earth-retaining wall, but the reinforced earth overflow dam is few.
加筋土结构在挡土墙中的应用已较为普及,但作为溢流拦河坝的坝体结构目前却较少。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
Therefore, the research of construction methods of dam diaphragm wall has important guiding significance to ensure the safety of deep excavation.
为此研究地下连续墙支护结构的施工方法,对保证深基坑开挖安全有重要的指导意义。
On this basis, the curve shapes and the formulas of upstream crest and downstream crest and those under the breast wall of the spillway dam are presented.
并以此为依据,提出有胸墙的溢流坝的堰顶上、下游及胸璃底缘的曲线型式和相应的计算公式。
The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.
左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
应用推荐