That both the structure and material of concrete dams and construction means of earth dams are used in roller compacted concrete dams make RCC dam increasingly used in water engineerings.
碾压混凝土将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.
碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。
To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.
理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。
Placing the flexible pipe in the middle of concrete lift is favourable for speeding up the dam concrete construction.
在浇筑层中间铺设软管为加快坝体混凝土的施工进度提供了有利条件。
Since concrete faceplate rock dam has obvious virtues of economical expenditure and shorter construction period, its ratio in DAMS is increasing nowadays.
混凝土面板堆石坝由于其具有经济、施工工期短等突出优点,因而在水坝中的比重日益增大。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
It is assuredly helpful to well know these characteristics for either proper design of rockfill dam with bituminous concrete core, or reasonable construction.
全面掌握这些特征,无论对沥青混凝土心墙堆石坝的正确设计,还是合理施工,无疑都是有帮助的。
The choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper.
本文就坝址选择及枢纽工程布置、混凝土面板堆石坝设计、施工和原型观测等方面进行了全面的论述。
A concrete construction simulation and management system is developed for Danjiangkou Dam heightening project as part of median-line of south-to-north water transfer project in the paper.
以南水北调中线丹江口大坝加高工程为背景,开发了丹江口大坝加高工程混凝土浇筑施工模拟与管理系统。
Experimental thermal parameters of concrete material considering the temperature conditions during construction were used in the design of Xibing Roller Compacted Thin Arch Dam.
溪柄碾压混凝土薄拱坝设计采用了仿真的材料热学参数。这些参数是在预测的施工温度条件下进行的材料实验中测定的。
Since the concrete defects are popular, the technology concerning detecting and repairing the defects takes an important role during the construction and operation of the dam engineering.
由于混凝土缺陷的普遍性,缺陷的检测与修补技术在水利水电工程建设及运营中占有重要的地位。
The intensity of concrete aggregates production changes with that of concrete placement during construction of a concrete dam.
混凝土坝施工过程混凝土浇筑强度变化,其骨料生产强度也应随之。
This paper sets up the model of the simulation via the analysis of the system of the Three Gorges concrete dam construction, and gives the ideas of system design and the simulation_software structure.
通过对三峡大坝混凝土施工系统分析,建立了相应的仿真系统模型,给出了仿真软件的系统设计思想及功能框架。
The causes for the serious leakage of the reinforced concrete face dam of Zhushuqiao Reservoir are analyzed based on the design, construction and field measured data.
根据设计、施工和现场检测资料,分析了株树桥水库钢筋混凝土面板堆石坝严重渗漏的原因。
Specially the characteristics of dam construction method, design of dam section, concrete mix, construction technique and temperature control are discussed.
特别对筑坝方法特点、断面设计、混凝土配合比、施工工艺和温度控制进行了论述。
An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.
对三峡工程泄洪坝段混凝土通仓浇筑,建立了模拟混凝土施工过程的整体模型。
Concrete construction of dam is typical dispersed event dynamic system (DEDS). Mutual action is very complex in DEDS, and it is very had to be expressed by mathematic analytic model.
大坝混凝土施工是一种典型的离散事件动态系统(DEDS),系统内相互作用较复杂,很难用一个数学解析模型来表达。
This paper makes a study of the system of construction diversion and the construction diversion optimum computation of the concrete dam.
本文以导流系统为研究对象,对混凝土大坝的施工导流给以优化计算。
The technique of extruded concrete side wall is a new method for construction of upstream face slab of CFRD, which was first used during construction of the Ita dam in Brazil.
挤压式混凝土边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The article introduces several development of concrete face rockfill dam construction in recent years.
文章主要介绍近年来混凝土面板堆石坝建设的若干新进展。
Based on the discrete-event simulation theory, the visualization and simulation of concrete dam construction system is developed by means of fixed time-step method.
基于离散事件仿真理论的混凝土坝施工系统,可视化和仿真开发通过固定时间步长法。
The concrete faced rockfill dam is regarded as an important type of dam in the hydraulic construction field because of some advantages such as: small, good safety and convenience of construction.
水利水电工程中,混凝土面板堆石坝具有断面小、安全性好、施工方便、造价低等优点,日益受到工程界的重视。
The horizontal construction joint treatment of Ertan Arch dam concrete, concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
After check and assessment, construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.
经检查评定查龙水电站面板坝填筑施工质量属优良水平。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
Now, the construction technique of rolled concrete dam with high temperature condition is one of the most attended research subjects by the domestic and foreign RCC constructers.
高温条件下碾压混凝土坝(RCC)施工技术已成为国内外从事RCC工作者最受关注的研究课题之一。
The sequencing of concrete grouting blocks on dam has a direct effect on the grouting progress and the uniformity of construction strength.
大坝混凝土浇筑块的排序方法影响其浇筑施工进度和施工强度的均衡性。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The major dam of Nierji water project is an earth - rockfill dam with asphalt concrete core. The construction diversion is used two stages.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。