• The fluid flow and transportation behavior of non-metal inclusion were studied in tundish of gas curtain dam by water model experiment and PW system.

    比较了传统堰组合,吹氩气挡墙分别代替堰、坝对中间流体流动特征影响,并尝试中间包内采用双幕挡墙的控流方式。

    youdao

  • The different applied grouting method and plug of the anti-seepage curtain of a reservoir dam will directly influence the advance, quality and cost of a construction.

    水库大坝基础防渗帷幕灌浆方法及其不同灌浆栓塞使用,直接影响工程施工进度质量成本

    youdao

  • The geological condition of Chencun Dam foundation is complicated, and the curtain of foundation has been grouted a few times.

    陈村大坝坝基地质条件复杂,对坝基帷幕进行了多次灌浆补强。

    youdao

  • This paper discusses the application and effect of chemical grouting in seepage proof curtain of interception-pollutant dam of Weihai waste treatment plant.

    文章讨论化学灌浆威海市垃圾处理厂截污防渗帷幕中的应用效果

    youdao

  • The effect of increasing drainage depth on seepage discharge and uplift of dam foundation is studied when curtain depth is fixed.

    帷幕深度一定分析了排水孔深度变化流量扬压力影响

    youdao

  • Generally, chemical interactions occurred between foundation rock (including grout curtain) and ground water are the main reason of many time-related engineering problems occurred in dam foundation.

    坝基岩体(包括防渗帷幕)其中地下水水溶液之间发生化学作用坝基晚期出现一系列病态问题重要的原因之一。

    youdao

  • The state of interaction, such as dissolution-deposition, of water-rock series (including rock, dam concrete and curtain-grouting) is usually of the behavior of uncertainty.

    水-系列(包括岩石大坝混凝土以及坝基帷幕体等)相互作用(溶解-沉淀作用)状态具有不确定性

    youdao

  • By curtain grouting, the dam foundation is reinforced and the leakage is reduced.

    经过坝基防渗补强灌浆加强坝基质量,减少了渗漏

    youdao

  • The curtain grouting project for the dam of Xiaolangdi Multipurpose project is large in size, big in difficulty, complex in geological conditions and high in technical requirements.

    小浪底大坝帷幕灌浆工程规模难度地质条件复杂技术含量

    youdao

  • The lap of diaphragm wall with curtain grouting is the weak point of dam base seepage control, so in construction process the lap quality must be ensured.

    接处整个坝基防渗薄弱点施工保证搭接质量

    youdao

  • For the seepage control of dam, the curtain grouting and back filled concrete have been adopted. Now the No.

    大坝渗透帷幕灌浆回填混凝土进行处理。

    youdao

  • For the seepage control of dam, the curtain grouting and back filled concrete have been adopted. Now the No.

    大坝渗透帷幕灌浆回填混凝土进行处理。

    youdao