Identify critical paths and bottlenecks early.
尽早判断出关键路径和瓶颈。
Critical paths are usually obtained by topological collating.
关键路径通常是在拓扑排序的基础上求得的。
This incorporates Tip 3: Identify critical paths and bottlenecks early.
这个合并在策略3中:在早期确定重要路径和瓶颈。
A new algorithm for finding the critical paths is proposed by using coding graph and without topological sort.
通过定义节点编码图概念,提出一种不需要拓扑排序的求解关键路径的新算法。
The deadlines of the activity instances that would be executed later were verified from the current time and the critical paths.
根据当前时间和所得到的关键路径对后续活动的截止期限进行了动态验证。
The method takes courses relation, time parameters, critical paths, critical courses and relative situation into account, then gives some flexible courses schemes.
该方法在综合考虑课程衔接关系、时间参数、关键线路、关键课程及相关约束的基础上,制定了灵活的专业课程排课计划。
The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.
工作的总时差是工作的最主要时间参数之一,是网络图中关键工作和关键线路的判别依据。
The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.
分析表明,核电工程建设的关键路径是核岛土建、核岛安装、与一回路冷态调试相关的单系统调试及联合调试。
This text has analysed three algorithms for finding the critical paths from several respects separately, such as complexity of the algorithm, the structure form of the data and easy degree.
本文分别从算法复杂度、数据结构形式及实现的容易程度等几方面分析了三种求关键路径算法的优劣。
Based on the concepts of both critical paths and suberitical paths. a model for the least cost scheduling in network project is built, and a new algorithm for solving this model is proposed.
本文基于关键路线和次关键路线的概念,建立了网络计划最低成本日程的模型,并提出一种求解该模型的新算法。理论分析和实际计算表明,它简单、易行、效果好。
These include professional structures that reward publication of analysis but not of data, and funding streams and career paths that continue to undervalue critical data management work.
这些障碍包括奖励分析结果发表而不是奖励数据共享的职业体系、以及继续低估关键数据管理工作的资金支持和职业地位。
This preserves space and places the most critical information in the user's view upon entry to the page (no scrolling necessary to navigate down the most common paths).
这能节省空间,并将最重要的信息放在用户向页面输入信息时的视图中(不需滚动即可浏览最常用的路径)。
From the quality analysis of NC machining of pressing dies of the motor vehicle covering parts, it shows that styling of the curved surface and cutter paths creating are two critical techniques.
对汽车覆盖件模具数控加工的质量分析表明,曲面造型和刀具运动轨迹的生成,是数控编程加工中的两大关键性技术。
Then, the critical state lines are provided based on the test results of different stress paths.
根据试验结果,确定了标准砂的临界状态线及临界状态参数。
Then, the critical state lines are provided based on the test results of different stress paths.
根据试验结果,确定了标准砂的临界状态线及临界状态参数。
应用推荐