  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    论述技术以及项目管理技术,并且根据图论技术项目管理技术设计关键路径算法以及网络图绘制算法。

    youdao

  • This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.

    就时网络计划在工程中如何确定关键线路分析工作时间参数、进行网络计划的控制等进行阐述

    youdao

  • This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.

    提出一种简化确定关键路径方法,该方法分别运用单代号双代号网络图中。

    youdao

  • In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).

    本文主要介绍网络计划模糊理论运用时间参数作为模糊变量的计算方法和模糊网络关键线路的确定

    youdao

  • Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.

    基于模糊网络计算方法研究提出新的网络参数计算关键线路判断方法

    youdao

  • As a critical part of MPLS technology, signaling protocol takes the responsibility to establish a data transmission path during adjacent LSRs in MPLS network.

    信令协议MPLS技术重要组成部分,它职责MPLS网络建立相邻lsr间的信息传输通路

    youdao

  • At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.

    同时利用区间网络关键路径模糊网络关键度关系计算出所有路径关键度。

    youdao

  • When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.

    工程网络计划活动持续时间为已知的确定值时,关键路径证明一个网络计划的有效方法

    youdao

  • This paper introduces a new method of determining the critical path of the network chart-node slack method.

    介绍一种确定网络关键线路方法——结点时差法。

    youdao

  • The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.

    网络计划技术制定计划项目进行管理方法,最常用的即关键线路法CPM计划评审技术PERT

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    由于系统网络形式进行工程管理,因此提供一个简单、直观制作网络图的平台。

    youdao

  • So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.

    网络图还工程分包提供计划依据,因此可以根据子网络图来划分工程分包范围

    youdao

  • So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.

    网络图还工程分包提供计划依据,因此可以根据子网络图来划分工程分包范围