According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
应用推荐