PHGAs are amplified from the base of the dam to the crest.
地震造成的水平加速峰值是从大坝坝基向坝顶急剧增加的。
The deformation process curve of the Wanjiazhai dam crest exhibits many peaks.
万家寨大坝坝顶各监测点的变形过程是多峰曲线。
Revetments protect the space from dam crest to the line a certain distance, normally 2.5m, under the minimum water level of the dam upstream.
护坡覆盖的范围,上游由坝顶护至水库最低水位以下一定距离,一般在最低水位以下2.5米。
For those downstream, they protect the space from dam crest to draining prism or to dam heel in event of no prism.
下游面则由坝顶护至排水棱体,无排水棱体时则护至坝脚。
Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.
针对除险加固措施,确定了水库特征水位与库容,计算了坝顶超高及坝顶高程,探讨了坝体和坝基防渗、坝面护坡及防冻等问题。
Therefore the proper plan of the filling of dam body and the arrangement of access roads to dam crest are the key problems to ensure the strength of construction.
因此,合理的坝体填筑规划及上坝道路布置是确保坝体施工的关键技术问题。
On this basis, the curve shapes and the formulas of upstream crest and downstream crest and those under the breast wall of the spillway dam are presented.
并以此为依据,提出有胸墙的溢流坝的堰顶上、下游及胸璃底缘的曲线型式和相应的计算公式。
The paper focuses on the key and difficult technical problem of crest overflow of concrete face rockfill dam, analyses and researches spillway on dynamical and static stability.
本文针对溢流混凝土面板堆石坝坝顶溢流的关键技术难题,分析研究了溢洪道的静力和动力稳定性。
The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.
糯扎渡水电站大坝所处地段的河谷系数小,施工条件差,上坝道路布置困难。
The outline of the masonry arch dam is double-curved, the dam body is impervious, the crest spillway is built of slotted-type bucket and the mid-discharge orifice is slit-type bucket.
模型试验和实际运行表明,浆砌石拱坝体型、坝体防渗及泄水建筑物等设计是成功的。
The outline of the masonry arch dam is double-curved, the dam body is impervious, the crest spillway is built of slotted-type bucket and the mid-discharge orifice is slit-type bucket.
模型试验和实际运行表明,浆砌石拱坝体型、坝体防渗及泄水建筑物等设计是成功的。