The proposal shall be prepared at the cost of the Contractor and shall include the items listed in Sub-Clause 13.3 [Variation Procedure].
承包商应自费编制此类建议书,并将其包括在第13.3款【变更程序】所列的条目中。
The proposal shall be prepared at the cost of the Contractor and shall include the items listed in Sub-Clause 13.3 [Variation Procedure].
承包商应自费编制此类建议书,并将其包括在第13.3款【变更程序】所列的条目中。
应用推荐