The scheduling classes are like a chain of modules assisting the core scheduler.
该调度类类似于一个模块链,协助内核调度程序工作。
The core scheduler USES this method to load-balance processes managed by the scheduling module.
内核调度程序使用这种方法实现由调度模块管理的进程的负载平衡。
Task_new: the core scheduler gives the scheduling module an opportunity to manage new task startup.
task_new:内核调度程序为调度模块提供了管理新任务启动的机会。
The microvisor implements the core microkernel with virtualization capabilities, which includes resource management as well as scheduling with real-time capabilities and low performance overhead.
microvisor实现了具有虚拟化功能的核心微核,这些功能包括资源管理以及具有实时功能和低性能开销的调度功能。
At the heart of NetKernel is a RESTful or resource-oriented microkernel responsible for resolving logical URI requests to physical code endpoints and scheduling the request on an available CPU core.
NetKernel的中心是一个REST风格或面向资源的微核,专门负责为物理代码解析逻辑uri请求并在空闲的CPU上安排执行请求。
The core theory of workshop produce plan and control is scheduling theory.
车间生产计划与控制的核心理论是调度理论。
The resource management is one of the core technology of the grid middleware realization while it includes the resource discovery, task scheduling as well as load balancing.
网格计算是下一代互联网的应用模式,资源管理是网格技术研究的核心任务之一,包含资源发现、任务调度和负载均衡。
Task scheduling is one of grid core services.
任务调度是网格核心服务之一。
Multicast scheduling algorithm is a core technology in DWDM multicast optical switching networks.
多播调度算法是DWDM多播光交换网的核心、关键技术。
Resources scheduling is one of core technologies of grid computing.
资源调度技术是网格核心服务之一。
Management of network link bandwidth using packet scheduling is one of core technologies for the guaranteed service quality of the network.
分组调度管理网络链路带宽,是实现网络服务质量的核心技术之一。
It is a fundamental and core issue that constructing better knowledge-based system to fulfill an efficient adaptive scheduling to complex manufacturing system.
对复杂制造系统进行有效的适应调度,构建性能优良的知识系统是基础和核心。
The control and scheduling of production planning of FMS act as the core of FMS running control system, and one of the key technologies as well which decide if FMS can obtain anticipated profit.
在FMS中,生产计划调度与控制是FMS运行控制系统的核心,是决定FMS能否取得预期经济效益的关键技术之一。
Determine what the core problems are and make an estimate regarding costs and scheduling.
这种情况下需要判断出其核心问题是什么,并且做出费用和进度方面的估算。
The data scheduling algorithm for P2P streaming media has been a research field in the core problem.
而数据调度算法一直是P 2 P流媒体研究领域中的核心问题。
Hi we're currently working on a system whose function is to support the core process of our department which is scheduling of classes.
你好,我们正在做一个系统的功能是支持我们的部门,调度类的核心过程。
Production planning and scheduling was the core of production and marketing management as well as the key technology which determines anticipated profits in complicated flexible manufacturing system.
在现代制造系统中,生产计划与作业调度是企业生产经营与管理,尤其是复杂、柔性制造系统能否取得预期经济效益的关键手段之一。
Production scheduling is the core content and the key technology in enterprises production management.
生产调度是石化企业生产管理的核心内容和关键技术。
Optimized parallel test task scheduling is the core issue and one of the key technologies to the parallel test.
并行测试的任务优化调度是并行测试技术的核心问题及关键技术之一。
In this paper, it is studied that the core component of Intelligent Vehicle Routing and Scheduling System, that is, intelligence solving mechanism.
本文研究了智能运输调度系统的核心部件——智能求解机制。
Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.
车间调度的优化问题,作为制造企业的核心,是一类具有时间约束、次序约束以及资源约束的组合优化问题。
The hot rolling scheduling is the core contents and key technology of hot rolling production management.
热轧轧制计划排程是热轧生产管理的核心内容和关键技术。
Universal engine's feature is making the engine core be absorbed in process scheduling, the IOC container be absorbed in service assemblage, so the engine can have a stronger universality.
通用引擎的特点是让引擎内核专注于流程的调度,IOC容器专注服务的装配,从而保证了引擎具有较强的通用性。
Chapter 5 primarily studies the core node's scheduling algorithm with many DSP parallel process.
第五章研究了核心节点调度算法的多dsp并行处理。
The production planning and scheduling system is the core of MES iron and steel enterprise, its directly affect the efficiency and cost of steel enterprise.
生产计划与调度系统是钢铁企业制造执行系统(MES)的核心,亦是整个综合自动化集成系统的重要组成部分。
Train scheduling is the core of Railway transportation Dispatching. Any operation activities must be carried out under the control of the dispatching.
铁路运输调度的核心是列车调度工作,凡是与铁路运输有关的各部门各工种都必须在运输调度的统一组织指挥下进行各项活动。
This paper introduces one way to design scheduling logic circuit with medium-scale integrated counter at the core and based on MSI.
介绍以中规模集成计数器为核心,结合中规模集成组合逻辑器件及少量门电路进行时序逻辑电路设计的方法。
The tasks scheduling in the grid is the core technology of the grid.
网格资源管理与调度是高性能网格计算领域中的一个重要研究课题。
To improve schedule efficiency and performance of multi-core processor system, a new thread scheduling algorithm is presented.
为提高多核处理器系统的调度效率,充分发挥多核处理器的性能,提出了一种新的线程调度算法。
This paper presents a novel test scheduling solution, unlike previous techniques that take advantage of balanced scan chains of every single core, utilizing the balance of pairwise combined cores.
不同于以往基于单个芯核扫描链平衡的调度技术,本文提出的对平衡调度技术是利用两个芯核配对后扫描链可能比单个芯核扫描链更平衡,获得比单平衡更短的测试时间。
应用推荐