• When the screwdriver is in place, remove the E-clip (Figure F) and pin connecting the structural members and the check clapper will open with no tension.

    螺丝刀就位后,拆卸f中的E夹连接结构部件的销钉回阀阀瓣没有张力的情况下开启

    youdao

  • Guide vane operation structure includes the guide vane arm clip board, guide vane arm, segmental keys, connection board, handle, cut pin, connecting rod pin and gland, etc.

    操作机构主要包括:导叶压板、导叶臂、分瓣连接耳柄剪断连杆压盖

    youdao

  • The tie-untie piece is either connecting pieces of press spring clip connecting piece or a nylon fibula, etc. and a zipper selects a metal zipper.

    簧卡连接件尼龙搭任一连接件,拉线选用金属链。

    youdao

  • The tie-untie piece is either connecting pieces of press spring clip connecting piece or a nylon fibula, etc. and a zipper selects a metal zipper.

    簧卡连接件尼龙搭任一连接件,拉线选用金属链。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定