This paper analyzes the present situation of pile foundation construction technology in Hengyang, introduces the application condition of prestressed high strength concrete pipe pile.
该文分析了衡阳地区桩基础施工工艺现状,介绍了预应力高强混凝土管桩应用条件。
The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north, Renyang Bridge and the quality detection are introduced in the paper.
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
In its construction, engineers adopted fastener steel pipe frames to support the semi-spherical dome in order to replace reinforcement concrete and foundation of the station.
本文论述沈阳老站圆形候车大厅保护性改造工程中,采用扣件钢管框架支撑半球形穹盖进行更换钢筋混凝土柱及基础的施工。
Through synthetical analysis, the application of the cement mixing pile to treat soft foundation is studied in the paper. The question of applying the prestressed concrete pipe pile is discussed.
经过综合分析,探讨了水泥搅拌桩在淤泥质软粘土中地基加固法,分析了预应力混凝土管桩问题的处理,提出了灌注桩在不同地质条件下的措施等方法。
Arranging observation pile has instructive significance to the construction of pre-stressed concrete pipe pile in soft soil foundation.
设置观测桩对预应力混凝土管桩在软土地基施工中具有指导意义。
Through the computation of ultimate vertical bearing capacity of a single pile and design pile layout and so on, summarized experience of designation about prestressed concrete pipe pile foundation.
介绍了一个应用预应力高强混凝土管桩的工程实例,通过单桩竖向极限承载力计算和布桩设计等多方面的设计过程,总结了在预应力高强混凝土管桩设计中的心得体会。
A 3d model was established for the composite foundation with cast-in-situ concrete thin-wall pipe piles. It was shown by the results of finite element analysis that the present model was reasonable.
建立现浇薄壁管桩复合地基三维模型,通过有限元模拟,与现场静载试验结果对比,表明建立的模型是可行的。
A 3d model was established for the composite foundation with cast-in-situ concrete thin-wall pipe piles. It was shown by the results of finite element analysis that the present model was reasonable.
建立现浇薄壁管桩复合地基三维模型,通过有限元模拟,与现场静载试验结果对比,表明建立的模型是可行的。