The mass concrete construction method for the equipment foundation in BX steel POSCO cold rolled sheet plant and technical measures for controlling its crack development were introduced in this paper.
介绍了本钢浦项冷轧薄板厂大体积混凝土设备基础的施工方法,以及控制其裂缝开展的技术措施。
The choice of plan with the foundation of equipment in complex soil, The count & control with the crevice for temperature of bib concrete are also discussed.
对在原有厂房内、复杂场地土上的机床基础的支护方案选择,大型机井的设计与施工,大体积混凝土温度裂缝的控制与计算进行的阐述。
The problem that the position of the bolt hole for reserving the equipment foundation is not precise in the process of casting concrete in prior art, and the template is hard to detach is solved.
解决了现有技术中存在的在混凝土浇筑过程中预留设备基础的螺栓孔洞的留设时位置不准确,模板拆除难的问题。
The application of composite foundation of plain concrete pile in chemical equipment reformation;
通过两组试验得到了素混凝土桩复合地基桩土应力分布的一些规律。
The application of composite foundation of plain concrete pile in chemical equipment reformation;
通过两组试验得到了素混凝土桩复合地基桩土应力分布的一些规律。