Reporters found a school district, wenzhou downtown room, 70 square meters, the landlord commitment unit price is 5000 yuan, total prices can fall down 350000 yuan.
记者采访发现,温州市中区一套学区房,70平方米,房东承诺单价可降5000元,总价减少35万元。
At least one foreign bank in the region has been asked to make a formal commitment to provide liquidity if its local unit gets into trouble.
至少已有一家外国银行被要求作出正式承诺,当其在该地区的分支机构陷入困境时,必须为它提供流动性。
Developers who have a serious commitment to quality should be writing unit tests for their work.
对质量有严重责任的开发员,应该为他们的工作书写单元测试。
In this paper, a DP with successive approximation method is designed for solving the hydropower unit commitment problem.
文章设计了一种逐次逼近动态规划法,可用于求解水电机组的组合问题。
An improved particle swarm optimization algorithm embedded with greedy search for solution of unit commitment.
求解机组组合问题的嵌入贪婪搜索机制的改进粒子群优化算法。
Power system unit commitment, a problem of nonlinear commitment optimization with typical large-scale hybrid integers, is difficult to get an optimal solution in theory.
电力系统机组组合问题是一个典型的大规模混合整数的非线性组合优化问题,很难得到理论上的最优解。
Comparing with traditional unit optimal commitment method, this method can manage the complicated constraints of unit optimal commitment expediently.
与传统的机组优化组合方法相比,该方法能方便地处理机组优化组合问题的复杂约束条件。
During the programming of the algorithm for the unit commitment problem, the complex constraints often lead the program to bad structure or wrong result.
在为机组组合问题编制算法的过程中,因需要满足错综复杂的约束条件,容易使程序结构混乱、逻辑判断出错,最终导致算法求解失败。
Computing time is greatly decreased and the global optimal solution is gained by using hybrid heuristic progressive optimality approach to unit commitment.
将该启发式方法与逐步动态优化法相结合进行机组最优组合,使计算时间大为减少,同时可保证得到最优解。
A stochastic unit commitment (SUC) method is presented, considering conventional thermal units, flexible generating units and wind turbines aimed at energy saving and environment protection.
一个的随机单位承担(SUC)方法,考虑到传统的热单位,灵活的发电机组和风力涡轮机在节能和环保的目的。
In this paper we give a survey of several stochastic programming models and algorithms for unit commitment problem under uncertainty load demands.
文章给出在不确定的荷载需求下机组组合问题的一些常见的随机规划模型和算法的综述。
The optimal unit commitment is solved via the Ant Colony Optimization algorithm in this paper.
采用进化优化算法——蚁群优化算法来求解机组最优启停问题。
This paper proposes a new hybrid particle swarm optimization method for unit commitment problem.
该文针对机组组合问题,提出了一种新的混合粒子群优化算法。
In order to reduce the operation cost and optimize the unit commitment, the fast algorithm about unit commitment based on revised BP ANN (Artificial Neural Network) and dynamic search is discussed.
为了使机组达到最优组合,减少运行成本,研究了基于修正BP人工神经网络与动态搜索的快速算法在机组组合中的运用。
To effectively solve the unit optimal commitment of power system, an improved parthenogenetic algorithm (IPGA) is presented.
为了有效地解决火电厂机组优化组合问题,作者提出了一种改进的单亲遗传算法。
Unit commitment is a problem must be taken into consideration when planning generation.
制定发电计划时,机组的启停是必须考虑的问题。
Different price mechanisms make the objective functions of unit commitment problems different, which causes traditional algorithms must be tuned to solve unit commitment problems in different markets.
不同结算电价机制下,机组组合的目标函数不同,传统机组组合方法必须根据电价机制的不同进行调整。
An example was tested and showed immune algorithm has good searching performance, and it is efficient for solving unit commitment problem compared with other optimization algorithms.
经实例验证表明,优化免疫算法具有良好的搜索性能,是解决机组优化组合问题的有效方法。
With the rise of Power Market, great changes have taken place in the Unit Commitment problem's objective function and constraints.
随着电力市场的兴起,机组优化组合问题的目标函数和约束条件都发生了重大的变化。
In this paper, the probabilistic technique is used to evaluate the spinning reserve requirements of the system, that is, the reliability constraint is considered in the model of unit commitment.
论文拟用概率方法评估系统的旋转备用,即在机组最优启停模型中引入可靠性约束。
Under the market environment, market clearing price has high uncertainty, which should be considered in self-unit commitment.
市场环境下,出清价格具有高度不确定性,必须在机组自组合决策中给予考虑。
Unit commitment scheme problem researched under competitive markets can helping power plants make good security and economic operating schedule.
在市场竞争条件下探讨发电厂机组启停机计划问题,有助于发电厂做好发电机组安全经济运行方案。
However, the relation between unit commitment risk and forced outage capacity is a discrete distribution, the Lagrangian Relaxation unit commitment algorithm isn't used directly.
但由于机组投运风险水平与机组强迫停运容量呈离散型的分布关系,因而难以与拉格朗日松弛法的机组组合算法有机结合。
For the purpose of practical use a unit commitment method considering transmission losses and line overload constraint is proposed in this paper.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
For the purpose of practical use a unit commitment method considering transmission losses and line overload constraint is proposed in this paper.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
应用推荐