• Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.

    龙首二级水电站黑河水能梯级规划第七座梯级电站

    youdao

  • The Hydropower Station is the key project in the cascade development in the middle and lowers of Lancang River, with complex geological condition of high rock slope at the intake.

    水电站澜沧江中、下游梯级开发关键工程,其进水口高边坡地质条件复杂

    youdao

  • To construct this hydropower station is a new milestone in the cascade development of Dadu River.

    瀑布沟水电站开工建设大渡河梯级开发一个新的里程碑

    youdao

  • The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.

    紧水电站计算机监控系统采用标准H9000系统,梯调和石塘调采用SSJ3000型计算机监控系统。

    youdao

  • The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.

    紧水电站计算机监控系统采用标准H9000系统,梯调和石塘调采用SSJ3000型计算机监控系统。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定