Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.
龙首二级水电站是黑河水能梯级规划的第七座梯级电站。
The Hydropower Station is the key project in the cascade development in the middle and lowers of Lancang River, with complex geological condition of high rock slope at the intake.
某水电站是澜沧江中、下游梯级开发的关键工程,其进水口高边坡地质条件复杂。
To construct this hydropower station is a new milestone in the cascade development of Dadu River.
瀑布沟水电站的开工建设是大渡河梯级开发的一个新的里程碑。
The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.
紧水滩电站计算机监控系统采用标准的H9000系统,梯调和石塘站调采用SSJ3000型计算机监控系统。
The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.
紧水滩电站计算机监控系统采用标准的H9000系统,梯调和石塘站调采用SSJ3000型计算机监控系统。
应用推荐