• Situations of some primary designs during construction of workshop building for the bulb tubular turbine set hydropower station of Dayuandu Junction are introduced.

    介绍大源渡枢纽水电站灯泡贯流式机组厂房建设中的一些主要设计情况

    youdao

  • The equipped bulb tubular turbine set has been applied to two level waterpower station of Zhenziling for the first time on the basis of performance analysis of homemade midget waterpower station.

    榛子岭二级水电站利用我国研制机组建成第一整装灯泡贯流式小型水电站。

    youdao

  • The equipped bulb tubular turbine set has been applied to two level waterpower station of Zhenziling for the first time on the basis of performance analysis of homemade midget waterpower station.

    榛子岭二级水电站利用我国研制机组建成第一整装灯泡贯流式小型水电站。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定