• By utilization of the existing boiler a horizontal combustion furnace and a burner that match have been designed for the recovery of the latent heat in the blow gas.

    利用原有锅炉设计与之匹配卧式燃烧燃烧器回收风气潜热

    youdao

  • The practice for 25MVA FeSi electric furnace blow in after long blowout was introduced. The new process of direct blow in with old electrodes was expounded in particular.

    介绍25MVA硅铁电炉长时间停炉开炉操作实践,着重论述了采用电极直接开炉操作的工艺

    youdao

  • Three ways of the internal blowing-off, i. e. , cold blow, hot blow, and gas exhausting in a Clock Hood-type furnace.

    本文着重研究扫(排气吹)三种方式

    youdao

  • This paper analyzes and summarizes the tap temperatured rop in the multiple blow furnace of No. 2 Steelmaking plant.

    对第二炼钢厂转炉的钢水出炉后温降进行了分析研究

    youdao

  • This paper analyzes and summarizes the tap temperatured rop in the multiple blow furnace of No. 2 Steelmaking plant.

    对第二炼钢厂转炉的钢水出炉后温降进行了分析研究

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定