• This paper calculates reliability index, lose efficacy probability and safety coefficient corresponding to the width of different barrier pillar.

    计算了与防水煤柱有关可靠度指标失效概率安全系数

    youdao

  • The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕,一次性进行回收

    youdao

  • The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕,一次性进行回收

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定