Sliding occurred in the slope side of spillway on the right bank after the spillway was excavated.
大水沟水库溢洪道开挖后,右岸边坡发生了滑动失稳。
The features of the spillway on bank of Fangzhu Hydropower Station are largeflow, aburpt slope, small curve, contraction along full length, torsion on the bottom.
方竹水电站岸边溢洪道集大流量、陡坡度、小弯道、沿程收缩、底板扭曲子一体。
The features of the spillway on bank of Fangzhu Hydropower Station are largeflow, aburpt slope, small curve, contraction along full length, torsion on the bottom.
方竹水电站岸边溢洪道集大流量、陡坡度、小弯道、沿程收缩、底板扭曲子一体。
应用推荐