The features of the spillway on bank of Fangzhu Hydropower Station are largeflow, aburpt slope, small curve, contraction along full length, torsion on the bottom.
方竹水电站岸边溢洪道集大流量、陡坡度、小弯道、沿程收缩、底板扭曲子一体。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。
应用推荐