• Due to the stress of backfilled soil, the asphalt coating at 3:00-9:00 (clock position) is easily disbonding and the CP is shielded, which results in the pipe body corrosion.

    回填土壤应力作用下,管道在3∶00 ~ 9∶00时钟位置石油沥青防腐容易出现剥离屏蔽阴极保护,导致腐蚀。

    youdao

  • Due to the stress of backfilled soil, the asphalt coating at 3:00-9:00 (clock position) is easily disbonding and the CP is shielded, which results in the pipe body corrosion.

    回填土壤应力作用下,管道在3∶00 ~ 9∶00时钟位置石油沥青防腐容易出现剥离屏蔽阴极保护,导致腐蚀。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定