• Shifting time from anchorage to unloading berth, time lost due to berthing operations and preparations by the vessel to berth, and time taken for completion of pratique at anchorage or after berthing.

    锚地卸货泊位移泊时间由于靠泊操作船只准备靠泊而损失时间以及锚地靠泊办完入港许可而花费的时间。

    youdao

  • Due to the influence of the weight and anchorage zone of the side span splay casting, unloaded cable shape is the shape with splay casting weight.

    散索套重量锚固设置影响,主缆线即为散索套重量下的空缆线形。

    youdao

  • If the vessel is compelled to wait for berth due to any reason, N/R shall be tendered upon the vessel's arrival at anchorage point for the DISCHARGE Point.

    如果任何原因船只必须等待靠泊船只到达卸货锚地后发出备妥通知。

    youdao

  • It is pointed out that the cause of decrease in cracking load is mainly due to the presence of ducts in concrete elements which weaken the bursting resistance of the anchorage zone.

    指出预留孔道削弱锚固劈裂能力,成为降低开裂荷载主要因素

    youdao

  • It is necessary to analyze the mechanical behavior of anchorage foundation due to the shortage of corresponding theoretical research.

    但是,目前还没有关于根式基础理论研究成果,有必要根式基础的受力特性进行分析

    youdao

  • It is necessary to analyze the mechanical behavior of anchorage foundation due to the shortage of corresponding theoretical research.

    但是,目前还没有关于根式基础理论研究成果,有必要根式基础的受力特性进行分析

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定