Shifting time from anchorage to unloading berth, time lost due to berthing operations and preparations by the vessel to berth, and time taken for completion of pratique at anchorage or after berthing.
从锚地到卸货泊位的移泊时间,由于靠泊操作和船只准备靠泊而损失的时间以及在锚地或靠泊后为办完入港许可而花费的时间。
Due to the influence of the weight and anchorage zone of the side span splay casting, unloaded cable shape is the shape with splay casting weight.
因边跨散索套重量及锚固区设置影响,主缆空缆线形即为有散索套重量下的空缆线形。
If the vessel is compelled to wait for berth due to any reason, N/R shall be tendered upon the vessel's arrival at anchorage point for the DISCHARGE Point.
如果因任何原因,船只必须等待靠泊,应在船只到达卸货地锚地后发出备妥通知。
It is pointed out that the cause of decrease in cracking load is mainly due to the presence of ducts in concrete elements which weaken the bursting resistance of the anchorage zone.
指出预留孔道削弱了锚固区抗劈裂的能力,成为降低开裂荷载的主要因素。
It is necessary to analyze the mechanical behavior of anchorage foundation due to the shortage of corresponding theoretical research.
但是,目前还没有关于根式基础的理论研究成果,有必要对根式基础的受力特性进行分析。
It is necessary to analyze the mechanical behavior of anchorage foundation due to the shortage of corresponding theoretical research.
但是,目前还没有关于根式基础的理论研究成果,有必要对根式基础的受力特性进行分析。
应用推荐