• During the Late Jurassic, this pull-apart basin reversed resulting from the eastward compression of the Alxa Block.

    侏罗世地区盆地由于受到阿拉善地块的挤压反转

    youdao

  • The seismic wave velocity in the crust and at the top of the upper mantle in the plateau is slower than that in the Indian subcontinent and Alxa block.

    高原地壳地幔顶部地震波速度小于印度次大陆阿拉善地块;

    youdao

  • The study was carried out within the Alxa desert steppe, Inner Mongolia of north China, Alxa desert steppe is one of serious degraded areas in the semiarid zone of north China.

    研究阿拉善荒漠草地过度放牧和围封恢复地上植被特征及土壤有机碳影响。

    youdao

  • The paper pointed out Ordos and Alxa Plateau were pastoral area, Boundary of Song and Tangut, Hexi Corridor belonged to mixed pastoral-farming area, Ningxia Plain was fanning area.

    指出了西夏具体经济区划:鄂尔多斯阿拉善高原畜牧宋夏沿边、河西走廊为半农半牧区宁夏平原为农耕区。

    youdao

  • The Middle-Lower Jurassic to the west of Ejin Qi-Alxa Youqi, and the Lower Cretaceous in the northwest part of the corridor, Zongnan and Zongbei De-pressions have better oil potential.

    额济纳旗-阿拉善右旗一线以西中下侏罗走廊坳陷北段宗南、宗北诸坳陷下白垩统含油气远景好。

    youdao

  • Junction zone between the Ordos and Alxa block is a shear zone with sections of variable trend. The northwestern and southeastern marginal region of the Ordos is under NNW SSE extension.

    鄂尔多斯地块阿拉善地块一个具有拐折结构剪切变形,鄂尔多斯地块西北角东南处于NNW -SSE方向的受拉伸状态。

    youdao

  • It is reported for the first time that the fossil Ostracods were collected from the Hua exploratory well 9 in the Huahai Depression of the Huahai Jinta Basin, Huxi New Village and Alxa Zuoqi.

    报道首次发现于花海-金塔盆地花海凹陷花探9、湖西新村阿拉善左旗早白垩世介形类化石

    youdao

  • Meanwhile, Alxa League planned to build the power plant and electric transportation channel in the pithead of Nalinsuhaite and eerdengbulage coal mine by the way of bundling the wind, light and fire.

    同时阿拉善计划、火”打捆方式规划建设那林苏海特额尔登布拉格煤矿坑口电厂电力外送通道

    youdao

  • Meanwhile, Alxa League planned to build the power plant and electric transportation channel in the pithead of Nalinsuhaite and eerdengbulage coal mine by the way of bundling the wind, light and fire.

    同时阿拉善计划、火”打捆方式规划建设那林苏海特额尔登布拉格煤矿坑口电厂电力外送通道

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定