So far, this trip partly resembles the Inception phase of an iterative development project: it's common to have a few release-defining (primary) features and several secondary or nice-to-do features.
迄今为止,这一旅行部分类似于迭代开发项目的初始(Inception)阶段:有一些版本定义的(主要的)特性和若干次要的或看是去很好的特性是很普通的。
The load operation of a three-phase induction-voltage regulator is presented briefly. The related data, phasor drawing and parameters in secondary circuit, primary load circuit and imput are analyzed.
简要介绍了三相感应调压器的负载运行情况,对二次回路参数、负载时一次回路参数、输入参数、相关数据和相量图进行了分析。
The load operation of a three-phase induction-voltage regulator is presented briefly. The related data, phasor drawing and parameters in secondary circuit, primary load circuit and imput are analyzed.
简要介绍了三相感应调压器的负载运行情况,对二次回路参数、负载时一次回路参数、输入参数、相关数据和相量图进行了分析。
应用推荐