In the case of an intermediate contract depth, the work to deepen the well would likely be done on a day-rate basis, or a "time and Materials" contract.
如果是中间点合同深度,则对井眼的加深作业可能采取日费合同或“时间和材料”合同。
In the case of an intermediate contract depth, the work to deepen the well would likely be done on a day-rate basis, or a "time and Materials" contract.
如果是中间点合同深度,则对井眼的加深作业可能采取日费合同或“时间和材料”合同。
应用推荐