用模具生产出来的首件检验模具的精度。
协助模具工程师对“首件检验报告”的处理;
Support tooling engineers in disposing First Article inspection reports;
参与新供应商的评估和调查审核流程,管理首件检验过程。
Participate in new supplier evaluations and survey audits, manage the first article verification process.
对新产品开发、工艺设计及首件检验批准中发现的问题进行管理。
Manages issues with design, process development, and first article approval of new products.
为什么把首件检验移动到第7.5.1.1条,而且把名称也改了?
Why was First Article Inspection (FAI) moved to clause 7.5.1.1 and renamed?
参与对首件样品的确认和检验工作,并协助实验室完成产品的测试;
Join to evaluate initial sample and first article inspection report, work close to PQS laboratory to product testing and approval.
工厂QC是否比较首件样品抽样检验和批准的规格表?
Does factory QC compare first piece samples with approval sample and specification sheet?
负责生产线首件、末件产品检验和试验;
负责生产线首件、末件产品检验和试验;