顾源说眼泪是忠诚。
国家电力监管委员会首席工程师顾峻源表示,截至周一早上,灾区供电能力已恢复到灾前水平。
Electricity supply has been restored to pre-quake levels as of Monday morning, according to gu Junyuan, chief engineer of the State Electricity Regulatory Commission.
肖玉华,何光碧, 顾清源,等。 2010。边界层参数化方案对不同性质降水模拟的影响[J]。高原气象,29 (2) : 331 –339。
Xiao Yuhua, He Guangbi, Gu Qingyuan, et al. 2010. Impact of boundary layer parameterization schemes on numerical simulation of different property precipitation[J]. Plateau Meteor, 29 (2) : 331 –339.
肖玉华,何光碧, 顾清源,等。 2010。边界层参数化方案对不同性质降水模拟的影响[J]。高原气象,29 (2) : 331 –339。
Xiao Yuhua, He Guangbi, Gu Qingyuan, et al. 2010. Impact of boundary layer parameterization schemes on numerical simulation of different property precipitation[J]. Plateau Meteor, 29 (2) : 331 –339.
应用推荐