如果您就要得到一个项目的初始需求文件,或者能够精确地估计并设计进而开发,会带来什么好处呢?
Wouldn't it be nice if you were to take the initial requirements document for a project and be able to accurately estimate the design and development effort?
当开发一个业务规则项目时,开发人员需要规定初始规则,设计规则模板和通过文件夹管理和组织规则。
When developing a business rule project, the developer specifies the initial rules, designs rule templates, and organizes the folders for managing the rules.
使用一个范例,本文演示了通过SoaML和XSD转换UM l概要文件为SOA项目设计Web服务和模式定义的典型方法。
Using an example, this article presented a practical way of designing web services and schema definitions for Soa projects by using SoaML and XSD transformation UML profiles.
设计机构和联合体参加本项目竞赛被视为接受本竞赛文件的全部条款和要求。
Participation of design firms and consortia shall be deemed to have accepted all terms and requirements of the Competition File.
根据技术要求进行产品或项目设计、编制技术文件、进行生产服务并参加项目调试工作。
Comply with technical requirements to design product or project, prepare technical documents, perform production service and participate in commissioning work.
为项目经理提供技术支持。参加客户的设计会议并监督客户的批准文件。
Support project manager for all technical matters. Attend design meetings with client and monitor client's design approval.
协助设计及项目管理部门管理有关规范结构问题的开发设计,协调,计算,准备以及提交文件。
To support the Design & Project management team to handle the design development, co-ordination, calculation, document preparation and submission in relation to structural & regulation issues.
解决方案:建筑信息建模(BIM)是达到建筑项目的设计和文件编制目的的新途径。)
The solution: Building information modeling (BIM) is a new way of approaching the design and documentation of building projects.
笔者任职以来一直主持企业技术管理的全面工作,对工程项目施工组织设计文件接触较多。
I have been presiding complete work of enterprise technology management since I took the position and often touch files of engineering project construction organization designs.
甲方上级对设计文件不审批或本合同项目暂停缓建,甲方均应支付设计费。
In case that the design documents are not approved by the superiors of Party a or the contract project is stopped to postpone, the design fee shall be paid Party a.
业主将向设计顾问提供设定本项目法定参数的所有文件、以及最新的反映施工现场所有进展的文件。
Client shall provide to Design Consultant all documents establishing the legal parameters of the project, together with the most current depicting all improvements on the site.
每一期有一个CD挤满了宝贵的设计资源和项目文件教程的杂志。
Each issue features a CD packed with invaluable design resources and project files for the tutorials in the magazine.
投标人不得直接或间接地与本次招标项目最终用户为该项目货物进行设计、编制规范和其他文件所委托的咨询公司或其附属机构有任何关联。
Bidders shall not, directly or indirectly, have any relevance with the consulting firms or its subsidiary bodies which commissioned by the project end-users of the.
而项目管理程序和作业文件主要从项目立项决策阶段、设计阶段、施工阶段、采购阶段、竣工验收与试运行阶段等几个阶段来论述。
Moreover, project management procedure and task document emphasis on the phases of setting and deciding a project, design, construction, purchase and finishing and pre-running.
整理项目档案及文件,追踪所有设计变更相关文件,并确认其正确性。
Organize project files and keep tracks on changes order, follow up with consultants; make sure the drawing is adhesive to the design.
当您处理项目或解决方案中的不同文件或处理设计器中的不同组件时,选定的项将会更改。
The selected item changes as you work with different files in a project or solution, or different components in a designer.
为了创建用户界面,设计器可能需要具备实例化项目项文件中所描述的类型的能力。
In order to create the user interface, the designer may need to be able to instantiate the types described in the project item files.
若要打开BDC 设计器,请双击项目中的模型文件。
To open the BDC Designer, double-click the model file in your project.
核电项目前期文件是指核电工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。
Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.
方案确认后,客户在最终设计稿上签字确认,结清设计项目余款,卓奥交付最终设计电子文件和版权转移书。
Program confirmed, customers sign the final draft design confirmed that the outstanding balance of design, final design Cho electronic document delivery and transfer of copyright books.
项目文件管理,包括设计文件,来往信件,会议纪要,装箱单和项目手册。
Project document arrangement, including design document, correspondence, meeting minutes, packing list and project manual.
甲方或其他审批单位对设计文件不审批或本合同项目暂停缓建,甲方均应支付应付的设计费。
In case the Party a or other approval units would not approve the design documents or the construction of this Contract is suspended, the Party a should also pay the payable design charges.
甲方或其他审批单位对设计文件不审批或本合同项目暂停缓建,甲方均应支付应付的设计费。
In case the Party a or other approval units would not approve the design documents or the construction of this Contract is suspended, the Party a should also pay the payable design charges.
应用推荐