• 在对基于RUP软件项目成本估算模型进行研究基础本文设计实现了基于RUP的软件项目成本管理系统

    This paper describes the software project cost estimate model based on RUP. Based on the survey, a software project cost management system is designed and realized.

    youdao

  • 实践结果表明,基于RUP软件项目成本管理系统是指导软件开发机构进行项目成本估算管理的一个较为有效的工具。

    The practice indicated that the cost management system of software project based on RUP could manage the cost estimate and management more successfully.

    youdao

  • 相反基准配置应该要求完全安全系统项目之初考虑附加时间管理工具方面成本

    Instead, the baseline configuration should call for a completely secure system with the additional cost in time, administration, or tools factored into the project up front.

    youdao

  • 通过法国总部ERP系统进行项目成本数据管理

    Project costs data management through our ERP system.

    youdao

  • 摘要成本控制理论工程项目管理理论系统中的重用组成部分

    Abstract: : the control theory of the cost is project management theory system of reuse components.

    youdao

  • 工程项目成本管理一项系统工程。

    Cost management was a systematic project of project items.

    youdao

  • 项目成本管理复杂系统工程,是一个动态管理过程

    Project cost management is a complex system engineering. It is a dynamic process.

    youdao

  • 利用系统可以提高复杂产品研制项目管理效率降低管理成本、更新管理观念。

    Using the system, the efficiency and the level of management will be improved, and the cost will be decreased.

    youdao

  • 项目管理知识领域,特别是范围、时间成本这三个知识领域很好应用到系统集成项目管理上,项目成功与否关键所在。

    The key factor whether our project can be successful or not, is how to apply scope management, timing management, cost management for management of system integrated project commendably.

    youdao

  • 用来管理项目工具成为产品Backlog,它系统或者一次发布期望列表,里面的内容按照价值成本风险优先级排序。

    Your primary tool for managing the project is called a Product Backlog, a list of features you want in the system or release, prioritized by value, cost, and risk.

    youdao

  • 软件项目管理是整个系统集成项目管理中的重要组成部分,它能够减少软件项目开发成本,加速软件项目开发进度,因此成为了各企业实施项目管理的重点。

    As an important part of project Management of System Integration, software PM can reduce the exploitation cost of software project, and accelerate the exploitation plan of software project.

    youdao

  • 其次项目涉及到成本类型进行了研究,然后结合稽征网络管理信息系统的特点制定出了成本计划控制措施

    Then, through analyzing the cost involved in project management, it formulates the cost plan and control measure for this project.

    youdao

  • 理论意义方面本文系统梳理成本管理在房地产项目管理中的重要意义。

    In terms of theoretical significance: This paper reviews the important significance of cost management in the project management of the real estate.

    youdao

  • 建立项目管理六大系统控制平台实现公司总部对项目进度、质量、安全、成本、合同及信息的控制,协助项目完成部分管理职能;

    The purpose is to realize the standardization of project management, the utilization of the mainland resource, the founded platform of system control , the remote calling for technical support;

    youdao

  • 建立项目管理六大系统控制平台实现公司总部对项目进度、质量、安全、成本、合同及信息的控制,协助项目完成部分管理职能;

    The purpose is to realize the standardization of project management, the utilization of the mainland resource, the founded platform of system control , the remote calling for technical support;

    youdao