Brouchoud与建设人员在虚拟模型中实时讨论,他还与一英国的客户一起设计他在美国开发的项目。
Brouchoud has also met with builders inside the virtual model for real-time discussions and has collaborated with a British client to design a project he was developing in the U.S..
在实践方面,进行了电力建设项目财务评价风险分析系统的设计与开发。
Finally on the side of practice, the design and exploitation about risk analysis system of financial appraisal in the modern power construction project are made in the paper.
开发建设项目项目水土保持监测是准确掌握项目建设水土流失动态变化和水土保持措施实施效果的重要手段与基础性工作。
Soil and water conservation monitoring for construction and exploitation projects is an important means to know about the process of soil erosion and the effects of combating measures objectively.
针对线形开发建设项目的水土流失与治理特点,从监测内容、对象到监测项目和方法,对线形开发建设项目水土保持监测技术进行了详细地阐述。
Based on its soil and water loss and treatment characteristic, the monitoring technology of linear zone development and construction project was elaborated from its content, object, item and method.
对开发建设项目与自然环境的影响引起广泛关注。
Ithas come through a concern about the effect of development projects on the natural environment.
由中心承担完成西部干旱地区节水技术开发与示范项目在国内18个基地建设评比中排名第一。
The project of developed and demonstrated technology of saving-water in Western arid area was undertaken and completed by the NCEIXJ, which is at the top of 18 domestic base constructions.
项目主要建设内容与规模:引进油脂加工新技术、开发新产品,新建一只油脂固化车间,一条固化油脂包装设备。
Construction and scale: Introduce advanced technology on grease processing, develop new products, establish grease solidifying workshop and a set of packing equipment.
对示范项目的建设与应用进行实证性研究,开发基于校园网的竞争情报教学实习管理系统,将示范项目解析、理论学习、课程实习管理有机地结合起来。
The empirical research on the construction of demonstration project is also carried out. And based on the campus net, the practice training software system in com…
该方法可操作性强,与实际结合密切,快速、精确度高,适用于各类开发建设项目施工阶段水土流失量的预测。
The method is combined with the practice closely and with high precision and fast speed, which can be used in the prediction of soil and water loss of different project in construction stage.
在佛山,禅城绿地中心项目包括两个分期建设阶段,430,000平方米的开发项目位于旧城区东部沿连接佛山与广州的主要干道。
In Foshan, the Chancheng Greenland Center involves a two-phased, 430,000-square-meter development located east of the Old City District on a major arterial roadway linking Foshan with Guangzhou.
这种现状与房地产企业不顾市场状况和企业自身经济实力,盲目开发建设项目有很大关系。
Apparently, the questions mentioned above are related with those real estate enterprises who start projects blindly irrespective of their own economic strength and the state of market.
这种现状与房地产企业不顾市场状况和企业自身经济实力,盲目开发建设项目有很大关系。
Apparently, the questions mentioned above are related with those real estate enterprises who start projects blindly irrespective of their own economic strength and the state of market.
应用推荐