在UML 1.1中,一个组件表现了实施项目,如文件和可运行的程序。
In UML 1.1, a component represented implementation items, such as files and executables.
石化工程项目实施的基本程序通常划分为8个阶段。
The fundamental implementation procedure of petrochemical engineering project normally is divided into 8 phases.
我们将提供一个基本准则,为学校使用的程序和实施的印第安纳高中保龄球项目支线计划。
We are going to provide a program with basic guidelines for schools to use and implement a feeder program for the Indiana High school Bowling program.
对将要执行的流程和程序做一个图表概述,以启动、实施项目中的变更并审核其效果。
Provide a diagrammatic representation of the processes and procedures to be undertaken in order to initiate, implement and review the effects of changes within the project. An example follows.
履约各方在执行程序过程中,职责分明,有效地保证了整个项目的顺利实施。
According to this management program, each side of contract has clear right and duty that makes the construction of the whole project in order.
项目管理团队利用项目管理信息系统实施整个项目行政与合同收尾程序。
The project management team uses the project management information system to perform both administrative and contract closure procedures across the project.
负责实施并执行生产项目的起重、吊装、装船等重大危险作业的安全方案程序,发现隐患立即整改。
Responsible for implementation of safety proposal and procedure for major hazardous operations such as lifting, lifting, shipment of production items, immediately correct if finding hidden danger.
项目管理方法系确定了协助项目管理团队实施项目行政与合同收尾程序的过程。
The project management methodology defines a process that AIDS a project management team in performing both administrative and contract closure procedures for the project.
介绍了国际工程项目合同管理的主要内容、主要业务程序进度和主要工作的实施。
This paper introduces the main contents, the major businesses' procedures and the implementation of the main works of the contract management of the international engineering projects.
论文特别对项目管理实施程序及矩阵式管理过程中如何实施进度、质量、费用等控制进行了较深入的探讨。
Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.
使用这4个参数,极限程序设计为实际项目的管理实施提供了简单而清晰的整体信息。
Using the FourVariables, ExtremeProgramming provides management with simple and clear insight into actual project performance.
到2005年,实施了供应链规划应用程序以及后续改善项目的企业,在五年的生命周期内,ROI可以提高40%(可能性0.7)。
Through 2005, enterprises that implement supply chain planning applications with a continuous improvement program will increase ROI by 40% during a 5 year lifecycle (0.7 probability).
到2005年,实施了供应链规划应用程序以及后续改善项目的企业,在五年的生命周期内,ROI可以提高40%(可能性0.7)。
Through 2005, enterprises that implement supply chain planning applications with a continuous improvement program will increase ROI by 40% during a 5 year lifecycle (0.7 probability).
应用推荐