针对绍山高速公路雪峰山隧道施工通风要求提出设计方案,介绍其工艺流程。
According to the ventilation requirements of Xuefengshan Tunnel of Shaoshan Superhighway, this paper puts forward the design scheme, and introduces its technical process.
并结合雪峰山隧道F8断层开挖与支护方法的选择,实践验证了模型可行性。
The model combines choices of methods of excavation and shoring in the F8 Fault of Xuefenshan tunnel, validates its feasibility by practice, and illuminates its academic and practical value.
本文以雪峰山隧道为工程实例,阐述了一种计算横通道间距的方法,并简述了该方法的应用。
A calculate method of cross passage interval in detail using Xuefengshan Tunnel as an object example is described, and the application of the calculate method is also given out briefly.
湖南雪峰弧形构造带中的苗儿山韧性剪切带存在糜棱岩和片理化岩石两大构造岩类,各具不同的变形特征。
In Xuefeng arcuate structural belt of Hunan, Miaoershan ductile shear zone includes two types of tectonites, mylonite and schistosity rocks, which have different deformed characteristics.
站在人参果坪西边的山坡上,自告奋勇的老乡会指着河谷东边群山之上的雪峰说,那是五色山。
Pointing to the snow-covered peak on the east side of the valley, the volunteer villager tells us that it is Mount Five Colours, or Wuseshan.
站在人参果坪西边的山坡上,自告奋勇的老乡会指着河谷东边群山之上的雪峰说,那是五色山。
Pointing to the snow-covered peak on the east side of the valley, the volunteer villager tells us that it is Mount Five Colours, or Wuseshan.
应用推荐