隧道衬砌在浅埋段的结构荷载计算表明,复合式衬砌中的初期支护和二次衬砌一般要共同承担荷载。
The calculation of structural load on the lining of tunnel with shallow overburden shows that the load on composite lining will be shared by primary support and secondary lining.
隧道衬砌在浅埋段的结构荷载计算表明,复合式衬砌中的初期支护和二次衬砌一般要共同承担荷载。
The calculation of structural load on the lining of tunnel with shallow overburden shows that the load on composite lining will be shared by primary support and secondary lining.
应用推荐