初步分析了单通道钻完井技术在我国海上油气田勘探开发中应用的可行性。
The application of monobore drilling and completion technique can cut the drilling and …
卡瓦打捞筒作为钻修井打捞工具,主要用于钻完井作业打捞落物的外捞工具。
Slip socket, the fisher of drilling and repairing well, is mostly used as the outer fisher to fish the drop during the drilling and completion.
在海洋探井钻井过程中,隔水导管的强度及稳定性对于安全钻完井作业具有重要意义。
In the operation progress of offshore exploratory well, the strength and stability of drilling riser can play an important role in offshore drilling and completion.
另外,挖潜剩余油技术、解除油层伤害技术、提高钻完井技术、深井采油技术等也需要攻关。
In addition, the techniques of producing remaining oil, preventing formation damage, improving drilling and completion and deep well production should be studied.
这种思路的提出,可以规范钻完井项目成本控制方法,为项目降低成本、提高工作效率和管理水平具有一定的指导性。
Using this theory, the cost controlling method of drilling and completion projects can be regulated so as to reduce the project cost and make work and management more efficiency.
介绍了辽河油田多分支井技术在锦612-12-新22分支井的钻完井施工情况,其中包括套管定向开窗技术、井身轨迹控制技术与分支井完井技术。
The paper introduces the operation situation of Jin 612-12-Xin22 multilateral well in Liaohe oilfield, including the directional milling, well path control and multilateral well completion.
这些风险又主要集中在钻、完井(包括修井) 两个主要环节上。
These risks centralize mainly in drilling and completion operation ( inclusion workover ).
大庆油田应用该系统为深层钻井完井设计施工提供了准确的井下数据,同时建立了一种新的随钻气层解释方法。
The Daqing Oilfield succeeded in providing drilling and completion operation with accurate bottom data by this system, and developed a novel explanation method of gas formation.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
在大多数情况下,随后的测量(如在完井阶段所进行的测量)都被校正至基于司钻深度的井口基准面。
In most cases, subsequent depth measurements, such as those made during the well completion phase, are corrected to the wellhead datum that is based on drillers depth.
该井采用了地质跟踪、无线随钻测量技术、螺杆钻具定向技术与DF - 1多分支井完井技术等。
This well employed Measured While Drilling, geologic followup, screw drill direction technology and DF-1 multilateral well completion technology.
改造后的钻井帽先后用于旅大油田群2座平台的钻、完井作业,有效地降低了开发成本。
The modified drilling cap was used in the drilling and completion on 2 platforms in the cluster of LD oil fields, as a result that the development cost has been reduce effectively.
其次,综合运用“层次分析法”和“模糊综合评价法”对川东北矿区油气钻井的钻前风险、钻进风险和完井风险进行系统评价,得出钻前、钻进和完井阶段的风险等级状况;
Secondly, to conduct a systematic assessment on the risks of the three stages with the integrated AHP and fuzzy evaluation method to obtained their respective degrees of risk status.
可在钻井、完井、采油、修井等方面进行有效应用的可膨胀管技术,被认为是2 1世纪石油钻采行业最有前景的技术之一。
Expandable Tubular technology is one core technology in petroleum industry in 21st century, which is used in drilling, completion, recovery and workover.
可在钻井、完井、采油、修井等方面进行有效应用的可膨胀管技术,被认为是2 1世纪石油钻采行业最有前景的技术之一。
Expandable Tubular technology is one core technology in petroleum industry in 21st century, which is used in drilling, completion, recovery and workover.
应用推荐