钢板桩合拢是钢板桩防渗墙施工的关键。
The closure of steel sheet piles is the key to the construction of steel sheet pile cut-off walls.
介绍桥涵基础施工中钢板桩围堰的设计与施工。
The construction and design of steel stake cofferdam are introduced at building of bridge and culvert foundation.
根据钢板桩围堰的实际受力状况建立力学模型。
A mechanical model is established based on the actual bearing capacity of the steel sheet cofferdam.
从青岛港钢板桩的锈层中分离到三种腐蚀性细菌。
Three species of Marine corrosive bacteria were isolated from the steel pillings of Qingdao Harbour.
文章重点介绍了大型船坞止水墙钢板桩工程施工方法。
This paper mainly introduces the construction methods of steel sheet pile of water sealing wall of large-size dock.
结合工程实例,介绍水上施打薄壁钢板桩的施工工艺。
The piling technology of thin -wall steel sheet pile on water is discussed combining with an engineering case.
钢板桩?。
钢板桩的入土深度与土质参数的取值和对撑的位置有关。
The depth into the soil by steel plate pile is associated with the value of the soil parameter and the location of bracing.
为改变这种不足,作者成功地以万能轧机开发出钢板桩。
To improve this disadvantage, the author succeeded to develop to roll sheet-pile with universal stands.
在近代工程中,筑围堰时一般先打下钢板桩以形成阻水层。
Cofferdams are made by driving metal sheet piling into the Bed to form a watertight fence.
因此,主要用于生产H型钢的万能轧机,生产钢板桩非常困难。
So, it is very difficult to roll it on the universal mills for H-beams.
钢板桩防渗墙施工是长江重要堤防隐蔽工程施工中的一种新工法。
Steel sheet pile seepage prevention wall is a new measure for the construction of concealed works of important dikes along the Yangtze River.
文中论述了“Z”型钢板桩施打平面位置、垂直度的控制等工艺和方法。
The paper highlights the technology and methods for laying out the Z-type steel sheet piles at sea and controlling the verticality of the steel sheet piles.
由于钢板桩施工工艺复杂,插打施工技术难度较大,存在着大量质量通病。
A great number of common quality defects take place in steel sheet driving construction due to its complicated workmanship and big technical difficulty.
钢板桩主要用于土木建筑,和H型钢及钢轨相同,属于主要型钢产品之一。
The sheet pile is used for civil construction and one of the main products of steel section like H-beam and Rail.
结合工程实际,主塔承台采用圆形钢板桩围堰施工,圆满完成了承台的施工。
In light of engineering practice, a round steel sheet pile cofferdam was used in the main tower caps and the construction of pile cap was successfully completed.
介绍了钢板桩码头的检测内容和相应的检测方法,并对检测结果进行了分析。
Methods of detecting the sheet pile quay are described and the detection results are analyzed.
一般而言,钢板桩由带孔型轧辊的二辊轧机轧制而成,而且必须多孔型轧制。
Generally speaking, sheet pile is rolled by grooved rolls on the 2 Hi mills and many grooves are necessary to roll it.
实际应用显示钢板桩的实施有利于减小渗流水头、降低堤身浸润线和出逸比降。
The effect of practice showed that the seepage prevention wall is beneficial to reducing the seepage water head, decreasing the seepage line inside dike and escape gradient.
广州港新沙港区的5个3.5万吨级码头,为我国首次采用格形钢板桩结构的码头。
The five 35000 DWT wharves at Xinsha Port Area of Guangzhou Port adopted the cellular steel sheet pile structure for the first time in China.
通过理论计算确定钢板桩围堰的实际受力,并通过实际施工情况验证该方法的可行性。
The actual bearing capacity of the steel sheet cofferdam is determined through the theoretical calculation and the feasibility of this method is checked and examined by the actual construction.
钢板桩施工组织设计编制合理,技术控制到位是保证钢板桩防渗墙顺利施工的必要前提。
The reasonable construction design and conscientious technical control is the essential prerequisite for the smooth construction of steel sheet pile seepage prevention wall.
实践证明,加热炉深基坑采用钢板桩拉锚支护设计合理,为工程的顺利施工发挥了重要作用。
The practice shows the design of support of deep base pit is reasonable and plays a significant role.
本文介绍了日本钢板桩护岸抗震设计方法的观念,以及试验中钢板桩护岸在抗震性方面的表现。
This paper introduces a concept of recent seismic design method for steel sheet pile revetment in Japan, and seismic behavior obtained by an experiment for steel sheet pile revetment.
施打过程中采取的主要措施是要控制合拢口两侧钢板桩的倾斜度,使其保持在0 .2 %以内。
The main measure in piling process is to control the inclination of the steel sheet piles on both sides of the gap not to exceed 0.2%.
通过对某一工程实例中甲乙双方对钢板桩租金费用索赔争议事件的分析,阐述了对处理此争议的观点。
By the analysis on the rent cost dispute for steel sheet piles be-tween both A and B sides in a engineering case, the view of treating this dispute is expounded.
中山东河水利枢纽工程修建在深厚淤泥质软土上,钢板桩围堰对于该种特殊地质条件有其独特的优越性。
Donghe Multipurpose dam Project in Zhongshan was built in the deep soft clay. The steel sheet pile cofferdam for this kind of special geological conditions has its own unique advantages.
介绍建设中的杭州湾跨海大桥,采用钢板桩围堰进行海上承台的主要施工技术与施工中应注意的主要问题。
In the paper, the construction technology of steel sheet pile cofferdam used in the rider cap construction of Hangzhou Bay Cross - sea Bridge and the advertent construction proceedings are introduced.
近来,阿塞拜疆国家石油公司的官员们宣布即将上马一个格鲁吉亚Kulevi原油码头钢板桩的保护项目。
Recently, officials from the State Oil Company of Azerbaijian announced a project is underway to protect the Kulevi Oil Terminal harbor in Georgia from potential corrosion to its steel sheet piles.
近来,阿塞拜疆国家石油公司的官员们宣布即将上马一个格鲁吉亚Kulevi原油码头钢板桩的保护项目。
Recently, officials from the State Oil Company of Azerbaijian announced a project is underway to protect the Kulevi Oil Terminal harbor in Georgia from potential corrosion to its steel sheet piles.
应用推荐