• 本方介绍了使用缝合结合krackow—bunnell缝法修复急性断裂。

    This article describes using suture anchors for repair of the acute ruptured patellar tendon with a combination of Krackow and Bunnell sutures.

    youdao

  • 结合工程实例详细介绍支护技术基坑开挖中的应用

    This paper analyzed the application of earth nail support technique in basis pit excavation in combination of engineering practice.

    youdao

  • 估计雨水渗进了,而正是这些使它们结合在一起的。

    He said he figured the rainwater had settled in the pinholes, where wooden dowels held the joints together.

    youdao

  • 本文结合福建省体育馆工程实际,介绍了饰石板锚固贴施工技术

    According to Fu Jian Gymnasium project, this paper introduced technology of plant nail to stick facing stone.

    youdao

  • 结合海口市基坑支护描述了支护设计施工工艺

    Combined with the support of a foundation pit in Haikou City, the design and construction technique of soil-nail wall support are described.

    youdao

  • 密切结合北京市某基坑支护工程实际,着重介绍了地面锚拉式支护结构的加固机理设计计算应用情况等。

    Based on an object in Beijing, the bracing mechanism, design and the application of soil-nail wall bracing system with ground anchor are introduced.

    youdao

  • 为了更好研究锚杆混凝土面层受力机理本文结合实际工程进行原位测试研究。

    To research the load mechanism of soil nailing, anchors and concrete surface better, the original testing research is carried out with help of practice project.

    youdao

  • 主要包括方案选择结合支护结构的支护体系设计基坑开挖监控测量

    Include choice of scheme, support system design of soil-nailing wall and anchor-pile composite supporting structure, excavate and monitor measurement in excavation engineering.

    youdao

  • 结合实例介绍隧道排水系统施工技术,重点介绍铺设防水卷材施工方法。

    Combined with the practice, the paper introduced the construction technology of tunnel waterproof and drainage system.

    youdao

  • 采用本实用新型能够辅助一起与石膏板墙体结合得更为紧密便于平稳物品

    The hanging nail assistant sleeve can be used for combining the hanging nails with the wall body of the gypsum board more tightly to stably hang articles.

    youdao

  • 结合武汉科技会展中心风化岩边坡支护工程介绍支护技术工作机理设计方法

    Taking the slope engineering of Wuhan Conference and Exhibition Center for Science and Technology as an example, the mechanism and design method of soil nailing are presented.

    youdao

  • 根据周边环境情况开挖深度采用钻孔灌注桩锚杆结合的支护形式。

    According to the depth of the circumstances of the excavation, the bored piles and soil anchor-bar are adopted.

    youdao

  • 评价弓根固定结合经椎弓根植治疗胸腰椎爆裂骨折临床疗效,探讨适应证

    To investigate curative effect for thoracolumbar burst fractures by the method of vertebral pedicle screw fixation applied in the with transpedicular bone graft, and consider its indications.

    youdao

  • 脚踏结合国内外同类产品优点精心设计制成

    Foot nail box machine, the system combines the advantages of similar products at home and abroad, carefully designed.

    youdao

  • 空间一个非常简单原始利用材料重叠结合构件结构系统建成的,这个结构利用材料自身的重量而没有使用任何胶水或者螺丝

    Thee space is built by a very easy and primitive constructive system of overlapping and joining pieces, taking advantage of their own weight without using any glue or screws.

    youdao

  • 目的:总结应用逆行髓内内固定结合CPM治疗股骨远端骨折疗效及经验。

    Objective: To observe the effect of retrograde intramedullary interlocking nail and CPM for treatment of patients with distal femoral fracture.

    youdao

  • 方法对49股骨骨折患者采用闭合复位加压螺纹固定结合中药治疗。

    Methods 49 cases of femoral neck fracture were treated with closed reduction internal fixation with compression spiral screw and traditional Chinese medicine.

    youdao

  • 本文研究结合受力特征,针对W的具体情况试验研究了栓的承载力布置方案,成果用于W桥的设计

    The characteristic of it and the strength, arrangement of its shear connectors are studied. The research results are being used in the design of W Bridge.

    youdao

  • 结论对于胸腰爆裂骨折患者,后路短节段椎弓根固定结合后外侧植骨融合增加内固定失败发生率

    Conclusion: For patients with thoracolumbar burst fractures, posterior short-segment pedicle screws fixation without fusion can increase the risk of implant failure.

    youdao

  • 强度减法显式有限差分法相结合计算复合支护稳定系数

    The strength reduction method and explicit finite difference method are used to calculate the global safety factor of the compound soil-nailed wall(CSNW).

    youdao

  • 深圳地铁工程少年宫开挖基坑围护结构采用1∶0.3结合预应力锚索联合支护体系。

    Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    youdao

  • 锚杆土层不同受力变形状态分析入手,结合长期工程实践和相关试验数据,分析研究与探讨性地提出了适用于不同类型刚度与变形的计算公式。

    The actual application state of anchorage technology is presented, such as types of bolt structure, anchorage machine, anchorage material, soil nailed wall and anchorage support of soft soils.

    youdao

  • 锚杆土层不同受力变形状态分析入手,结合长期工程实践和相关试验数据,分析研究与探讨性地提出了适用于不同类型刚度与变形的计算公式。

    The actual application state of anchorage technology is presented, such as types of bolt structure, anchorage machine, anchorage material, soil nailed wall and anchorage support of soft soils.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定