• 相似材料模型实验研究地下采矿引起岩层变形情况的重要方法。

    The Similar Material Model is usually used to study the deformation of the terrane.

    youdao

  • 而在采矿工程中,相似材料模拟往往模型岩层弯曲变形断裂破坏关键问题

    In mining engineering, strata models are often simulated by similar material simulation model, rock bending deformation and fracture damage is the serious problem.

    youdao

  • 采矿方法选择一个复杂过程目前尚无满意数学模型予以描述

    The selection of mining methods is a complex process and there is no satisfactory mathematic model to describe it yet.

    youdao

  • 由于采矿方法选择诸多因素影响制约难于建立一个数学力学模型方法加以处理。

    It is difficult to establish a simple model which the mathematic or mechanical method can be used in the selection lf mining method, due to many influence and constraint factors.

    youdao

  • 采场顶板简化为岩梁模型,岩梁最大应力及其极限跨距采矿工程涉及到两个重要参数。

    The roof in working areas is simplified as rock beam, the maximum tensile stress and limited span of rock beam are important in mining engineering.

    youdao

  • 本文根据采矿工程实际提出了胶结充填开采边界数值模型

    Based on mining engineering actualities, the paPer puts forward a boundary element numerical model for consolidated fill mining.

    youdao

  • 采矿工厂本身主要数码模型合成,火山环境大型微缩景观,里面充满可以流动的假熔岩。

    The collection facility environment itself was largely realized as a digital model. The mountainous surroundings was made up of a massive miniature permeated with actual moving rivers of stage lava.

    youdao

  • 实际应用表明模型取代传统的经验类比法,直接采矿爆破提供定量设计依据

    It is showed in practice that the model can directly give quantitative design basis forb lasting.

    youdao

  • 通过信息可视化技术研究提出基于采矿引起的地表移动信息的三维可视化研究模型

    A 3-d visual study model is put forward by studying visual information technology, which based on the information caused by mining.

    youdao

  • 针对我国水平实际情况,建立具有级缓冲仓柔性连接运输系统可靠性的计算机模拟模型

    In view of real situations in multi level underground mines, a computer simulation model of reliability of mining haulage system with two ore bins has been established.

    youdao

  • 建立了各种结构类型岩体力学模型大面积采矿围岩稳定性模拟分析提供了可靠依据

    Rock mechanics model has been established for different types of rock structure to offer a reliable basis for a comparative analysis of host rock stability while mining in a broad area.

    youdao

  • 煤炭资源采矿便利收益双因素模型

    Coal resources; Mining rights; Convenience yield; Two-factor model.

    youdao

  • 模型计算结果用于矿山资源评估采矿计划编制资源开采设计工作,促进矿床资源开采质量管理水平提高。

    The built models and calculation results had been applied to resource assessment, mining plan, and so on, which improved the quality of mineral deposit resource mining and the management level.

    youdao

  • 利用动力学分析软件ADAMS建立采矿矿车船上吊过程虚拟样机模型,对集矿车的船上吊运过程进行模拟与动力学仿真。

    Virtual prototype of ship and process of transporting the collector were constructed in ADAMS and the process of transporting it were simulated.

    youdao

  • 模型应用于某矿山采矿评估,结果表明:采矿价值采矿期权期限的增加呈现出先增后减的趋势;

    Practical mining activities characteristics of mineral resources were discussed combined with concrete cases. The improved Black-Scholes model was used in mining rights value evaluation.

    youdao

  • 通过分析转向过程中采矿与海底底质作用力关系,建立采矿海底斜坡转向的运动学模型设计了以最优控制器核心转向控制系统

    Secondly, the mining vehicle's kinematic model is deduced as driving on the slope. Finally, the optimal steering controller is designed as a key determinant of the turning control system.

    youdao

  • 本文地质条件出发,用岩石力学观点有限元模型两种方法进行比较、分析选择采矿方法综合决策提供了力学方面的论证。

    From the geologic conditions in Kalatongke Mine, the paper has made analysis, comparison and selection between both the above methods and provided grounds on rock mechanics for...

    youdao

  • 此外实验证明所设计模糊pid控制算法采矿模型速度控制也是有效

    In addition, the fuzzy PID control algorithm appling to the speed control of the model machine is proved effective.

    youdao

  • 此外实验证明所设计模糊pid控制算法采矿模型速度控制也是有效

    In addition, the fuzzy PID control algorithm appling to the speed control of the model machine is proved effective.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定