回答以上的问题,就可以完成以下部分过程时间表,及未来通信的联系点。
Answering these questions allows you to populate both sections Process Schedule, and Points of contact for future correspondence.
在过去,做时间表是很简单的,但现在我们有更多的课程,让这个过程变得复杂的是,当中许多课程还有不同选择。
In the past, doing the timetabling was quite simple but now we have a lot more courses and what's made it complicated is that many of them have options.
他说,此后,重建过程就开始了—虽然略微有点滞后于时间表。
Since then, he says the reconstruction process has moved forward - albeit slightly behind schedule.
这意味着需求过程需要被紧密的集成,按照与解决方案的迭代式开发同样的时间表运行。
This means that the requirements process needs to be tightly integrated with, and executed to the same timetable of, the iterative development of the solution.
其实,在这两个过程中,你都做了同样的事情:描述任务、评估工作量、在时间表上跟踪项目进度。
You're really doing the same thing in both cases: documenting tasks, gathering work estimates, and tracking progress with an eye on the schedule.
制定时间表和期限,在向目标迈进的过程中,你就跟踪自己的进度。
By setting a timetable and a deadline, you will be able to track your progress to achieve the resolution you desire.
在协商的过程中,你需要基于项目时间表,在多种选择中作出决断。
Use the project schedule to justify pursuing one of these options.
看一下清单3,其中说明了通过API发布新状态消息到用户时间表的过程。
Take a look at Listing 3, which illustrates the process of Posting a new status message to the user timeline through the API.
让我们回到最初的场景,请看图1,我们打算基于分配过程建立一个时间表应用程序。
Let's get back to our initial scenario illustrated in Figure 1, where we plan to build a timesheet application with a focus on an approval process.
第四部分展示了如何自动化的创建您的构建过程,如何使用CruiseControl定期合理安排构建时间表。
Part 4 shows you how to automate your build process and start using CruiseControl to schedule the builds on a regular basis.
根据这个时间表,衰退过程已经接近尾声。
悲痛是一个过程,而不是一种状态。在我看来,人们悲痛情绪的波动是没有固定(准确)的时间表的。
Grief is a process, not a condition, and from my perspective there is no correct timetable for the waves of grief that people feel.
整个过程可能需要8到10周。请参阅时间表(PDF)。
Processing may take up to 8-10 weeks. Please view the schedule (PDF) for details.
他说,“悲痛是非常个性化的并且它包含许多因素,悲痛是一个过程,而不是一种状态,并且从我的观点来看对于人们感觉的悲痛波动没有正常的时间表。”
"Grief is very personal and many variables are involved," he says. "grief is a process, not a condition, and from my perspective there is no correct timetable for the waves of grief that people feel."
他说,由于人民币资本项目下的可兑换本来就没有时间表,所以不存在因东南亚金融危机而延长这一过程的问题。
He said, as there never was a schedule for exchangeability under RMB capital projects, therefore the process of delaying the process due to the Southeast Asian financial crisis does not exist.
本文给出了一种解“时间表问题”的启发式算法,从整个时间表的生成过程来说,它是一种并行和无回溯的方法;
This paper presents a heuristic algorithm to solve the time tabling problem, which is a parallel and no-go-back method and uses a improved Tabu eearch to get daily feasible timetable.
定义项目工作的范围,时间表,和控制过程。
Defines the parameters of the project work, timeline, and control process.
利用公式可制订调换变换牙的时间表,从而能控制整个织造过程中泡、地经纱的送经比。
According to this formula, the time of changing wheel is obtained, thus the ratio of warp velocity of base and crepe axis may be controlled during the whole weaving process.
没有时间表已放在过程和利物浦足球俱乐部将作出一个新的经理,直到没有进一步说明是任命的。
No timescale has been placed on the process and Liverpool FC will make no further statement until a new manager is appointed.
没有时间表已放在过程和利物浦足球俱乐部将作出一个新的经理,直到没有进一步说明是任命的。
No timescale has been placed on the process and Liverpool FC will make no further statement until a new manager is appointed.
应用推荐