本文在计算拱坝应力的试载法中采用有限元地基,以克服伏格特F。
In the trial load method for calculating arch-dam stress, this paper adopts the FEM to overcome shortcoming of the f.
自平衡试桩法是一种基桩静载试验新技术,是接近于竖向抗压桩实际工作条件的一种试验方法。
The self-Balanced method is a new technologies of foundation pile static load test, vertical compression pile is closer to the actual working conditions of a test method.
提出了一种自平衡试桩结果转化成传统静载试验曲线的解析法。
An analytical solution transformation method (ASTM) of transforming the data of the O-cell pile testing method into the conventional load-settlement is put forward.
提出了一种自平衡试桩结果转化成传统静载试验曲线的解析法。
An analytical solution transformation method (ASTM) of transforming the data of the O-cell pile testing method into the conventional load-settlement is put forward.